27
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | Commercial printing, lithographic | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| AS0418 #08 Y:2005 | 08 | 2005 | Use solar heat to heat water | $358 | $2,800 |
n/a
|
| AS0418 #07 Y:2005 | 07 | 2005 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,386 | $3,000 |
n/a
|
| AS0418 #06 Y:2005 | 06 | 2005 | Use optimum size and capacity equipment | $3,394 | $1,900 |
n/a
|
| AS0418 #05 Y:2005 | 05 | 2005 | Reduce the pressure of compressed air to the minimum required | $4,272 | $1,000 |
n/a
|
| AS0418 #04 Y:2005 | 04 | 2005 | Install direct acting units in place of compressed air pressure system in safety system | $6,612 | $550 |
n/a
|
| AS0418 #03 Y:2005 | 03 | 2005 | Replace existing hvac unit with high efficiency model | $12,196 | - |
n/a
|
| AS0418 #02 Y:2005 | 02 | 2005 | Eliminate/reduce redundant inspections | $15,053 | - |
n/a
|
| AS0418 #01 Y:2005 | 01 | 2005 | Utilize higher efficiency lamps and/or ballasts | $21,182 | $15,913 |
n/a
|
| NV0165 #03 Y:2000 | 03 | 2000 | Recycle waste ink and cleanup solvent | $53,808 | $145,915 | n/a |
| NV0165 #02 Y:2000 | 02 | 2000 | Utilize higher efficiency lamps and/or ballasts | $140,415 | $259,240 | n/a |
| NV0165 #01 Y:2000 | 01 | 2000 | Eliminate or reduce compressed air usage | $544,084 | $20,618 | n/a |
| NV0127 #10 Y:1999 | 10 | 1999 | Meter recycled water (to reduce sewer charges) | $1,343 | $325 | |
| NV0127 #09 Y:1999 | 09 | 1999 | Change rate schedules or other changes in utility service | $1,890 | - | |
| NV0127 #08 Y:1999 | 08 | 1999 | Use radiant heater for spot heating | $3,636 | $4,525 | |
| NV0127 #07 Y:1999 | 07 | 1999 | Install skylights | $1,727 | $3,945 | |
| NV0127 #06 Y:1999 | 06 | 1999 | Install compressor air intakes in coolest locations | $704 | $80 | |
| NV0127 #05 Y:1999 | 05 | 1999 | Utilize energy-efficient belts and other improved mechanisms | $375 | $64 | |
| NV0127 #04 Y:1999 | 04 | 1999 | Recharge batteries on during off-peak demand periods | $1,768 | $588 | |
| NV0127 #03 Y:1999 | 03 | 1999 | Optimize plant power factor | $1,216 | $2,533 | |
| NV0127 #02 Y:1999 | 02 | 1999 | Insulate bare equipment | $123 | $222 |