Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

89

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Commercial printing
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
BD0478 #08 Y:2016 Re-arrange equipment layout to reduce labor costs $13,019 $7,560
BD0478 #07 Y:2016 Install occupancy sensors $751 $450
BD0478 #06 Y:2016 Install compressor air intakes in coolest locations $784 $900
BD0478 #05 Y:2016 Utilize higher efficiency lamps and/or ballasts $1,111 $575
BD0478 #04 Y:2016 Eliminate leaks in inert gas and compressed air lines/ valves $1,217 $1,000
BD0478 #03 Y:2016 Reduce the pressure of compressed air to the minimum required $1,961 $15
BD0478 #02 Y:2016 Lower temperature during the winter season and vice-versa $2,345 $15
BD0478 #01 Y:2016 Utilize higher efficiency lamps and/or ballasts $4,978 $3,229
BD0383 #06 Y:2010 Install occupancy sensors $955 $975
BD0383 #05 Y:2010 Install compressor air intakes in coolest locations $1,087 $1,500
BD0383 #04 Y:2010 Use most efficient type of electric motors $2,708 $1,620
BD0383 #03 Y:2010 Use radiant heater for spot heating $8,456 $4,240
BD0383 #02 Y:2010 Utilize higher efficiency lamps and/or ballasts $21,355 $7,633
BD0383 #01 Y:2010 Re-use or recycle hot or cold process exhaust air $22,085 $7,000
BD0329 #09 Y:2007 Minimize water usage $977 $2,000
BD0329 #08 Y:2007 Change operating conditions $3,140 -
BD0329 #07 Y:2007 Utilize energy-efficient belts and other improved mechanisms $3,306 $2,200
BD0329 #06 Y:2007 Use most efficient type of electric motors $4,834 $3,600
BD0329 #05 Y:2007 Utilize higher efficiency lamps and/or ballasts $237 $225
BD0329 #04 Y:2007 Install occupancy sensors $3,724 $225