Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

21

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Paperboard mills
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
IA0381 #21 Y:2005 Turn off equipment when not in use $4,144 $1,925
IA0381 #20 Y:2005 Repair and eliminate steam leaks $252 $600
IA0381 #19 Y:2005 Turn off equipment during breaks, reduce operating time $366 $50
IA0381 #18 Y:2005 Direct warmest air to combustion intake $2,512 $170
IA0381 #17 Y:2005 Use waste heat from hot flue gases to preheat $44,160 $18,000
IA0381 #16 Y:2005 Adjust burners for efficient operation $6,473 $1,000
IA0381 #15 Y:2005 Recover waste heat from equipment $69,963 $111,000
IA0381 #14 Y:2005 Recover waste heat from equipment $6,174 $4,244
IA0381 #13 Y:2005 Recover waste heat from equipment $9,399 $730
IA0381 #12 Y:2005 Lower temperature during the winter season and vice-versa $4,143 $2,410
IA0381 #11 Y:2005 Lower temperature during the winter season and vice-versa $1,907 $425
IA0381 #10 Y:2005 Turn off equipment when not in use $20,975 $250
IA0381 #09 Y:2005 Size electric motors for peak operating efficiency $50,899 $10,400
IA0381 #08 Y:2005 Utilize energy-efficient belts and other improved mechanisms $2,966 $345
IA0381 #07 Y:2005 Use most efficient type of electric motors $1,382 $458
IA0381 #06 Y:2005 Disconnect ballasts $6,622 $375
IA0381 #05 Y:2005 Install occupancy sensors $1,196 $300
IA0381 #04 Y:2005 Utilize higher efficiency lamps and/or ballasts $593 $877
IA0381 #03 Y:2005 Reduce the pressure of compressed air to the minimum required $3,656 $25
IA0381 #02 Y:2005 Install compressor air intakes in coolest locations $8,477 $416