Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

39

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Wood household furniture, except upholstered
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
OK0754 #09 Y:2007 Chill water to the highest temperature possible $8,086 -
OK0754 #08 Y:2007 Install partitions to reduce size of conditioned space $660 $5,303
OK0754 #07 Y:2007 Apply for tax-free status for energy purchases $32,400 $320
OK0754 #06 Y:2007 Replace existing hvac unit with high efficiency model $4,226 $113,794
OK0754 #05 Y:2007 Install compressor air intakes in coolest locations $1,311 $814
OK0754 #04 Y:2007 Recover waste heat from equipment $3,351 $4,638
OK0754 #03 Y:2007 Eliminate leaks in inert gas and compressed air lines/ valves $4,872 $1,000
OK0754 #02 Y:2007 Apply for tax-free status for energy purchases $13,115 $1,600
OK0754 #01 Y:2007 Begin a practice of predictive / preventative maintenance $3,500 -
OK0679 #08 Y:2003 Burn wood by-products for heat $15,109 $40,700
OK0679 #07 Y:2003 Apply for tax-free status for energy purchases $32,645 $2,000
OK0679 #06 Y:2003 Utilize higher efficiency lamps and/or ballasts $1,675 $3,067
OK0679 #05 Y:2003 Install occupancy sensors $671 $750
OK0679 #04 Y:2003 Eliminate leaks in inert gas and compressed air lines/ valves $1,737 $1,067
OK0679 #03 Y:2003 Optimize plant power factor $13,448 $6,150
OK0679 #02 Y:2003 Begin a practice of predictive / preventative maintenance $16,000 -
OK0679 #01 Y:2003 Reschedule plant operations or reduce load to avoid peaks $18,651 -
AR0178 #06 Y:1999 Install equipment to move product $37,488 $50,000
AR0178 #05 Y:1999 Install equipment (eg compactor) to reduce disposal costs $12,779 $19,000
AR0178 #04 Y:1999 Utilize energy-efficient belts and other improved mechanisms $341 -