42
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | Hardwood dimension and flooring mills | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| WV0386 #06 Y:2008 | 06 | 2008 | Use radiant heater for spot heating | $3,371 | $7,700 | |
| WV0386 #05 Y:2008 | 05 | 2008 | Insulate bare equipment | $4,653 | $920 | |
| WV0386 #04 Y:2008 | 04 | 2008 | Use waste heat from flue gases to heat space conditioning air | $7,586 | $8,100 | |
| WV0386 #03 Y:2008 | 03 | 2008 | Use waste heat from hot flue gases to preheat | $15,988 | $8,450 | |
| WV0386 #02 Y:2008 | 02 | 2008 | Use waste heat from hot flue gases to preheat | $16,673 | $8,525 | |
| WV0386 #01 Y:2008 | 01 | 2008 | Install equipment to utilize waste fuel | $140,425 | $517,666 | |
| WV0201 #16 Y:2000 | 16 | 2000 | Replace existing equipment with more suitable substitutes | $20,000 | $3,000 | |
| WV0201 #15 Y:2000 | 15 | 2000 | Contract a wood pallet recycling company | $20,000 | $300 | |
| WV0201 #14 Y:2000 | 14 | 2000 | Contract a wood pallet recycling company | $56,250 | $300 | |
| WV0201 #13 Y:2000 | 13 | 2000 | Separate and recycle scrap metal to foundry or for sale | $3,000 | $600 | |
| WV0201 #12 Y:2000 | 12 | 2000 | Utilize energy-efficient belts and other improved mechanisms | $2,057 | $500 | |
| WV0201 #11 Y:2000 | 11 | 2000 | Chill water to the highest temperature possible | $1,887 | $40 | |
| WV0201 #10 Y:2000 | 10 | 2000 | Utilize a less expensive cooling method | $1,435 | $530 | |
| WV0201 #09 Y:2000 | 09 | 2000 | Insulate bare equipment | $922 | $278 | |
| WV0201 #08 Y:2000 | 08 | 2000 | Change rate schedules or other changes in utility service | $11,068 | $300 | |
| WV0201 #07 Y:2000 | 07 | 2000 | Reduce the pressure of compressed air to the minimum required | $3,718 | $60 | |
| WV0201 #06 Y:2000 | 06 | 2000 | Install compressor air intakes in coolest locations | $2,113 | $720 | |
| WV0201 #05 Y:2000 | 05 | 2000 | Reduce illumination to minimum necessary levels | $1,544 | $240 | |
| WV0201 #04 Y:2000 | 04 | 2000 | Establish a predictive maintenance program | $4,675 | $800 | |
| WV0201 #03 Y:2000 | 03 | 2000 | Analyze flue gas for proper air/fuel ratio | $3,889 | $1,000 |