Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

42

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Hardwood dimension and flooring mills
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
WV0386 #06 Y:2008 Use radiant heater for spot heating $3,371 $7,700
WV0386 #05 Y:2008 Insulate bare equipment $4,653 $920
WV0386 #04 Y:2008 Use waste heat from flue gases to heat space conditioning air $7,586 $8,100
WV0386 #03 Y:2008 Use waste heat from hot flue gases to preheat $15,988 $8,450
WV0386 #02 Y:2008 Use waste heat from hot flue gases to preheat $16,673 $8,525
WV0386 #01 Y:2008 Install equipment to utilize waste fuel $140,425 $517,666
WV0201 #16 Y:2000 Replace existing equipment with more suitable substitutes $20,000 $3,000
WV0201 #15 Y:2000 Contract a wood pallet recycling company $20,000 $300
WV0201 #14 Y:2000 Contract a wood pallet recycling company $56,250 $300
WV0201 #13 Y:2000 Separate and recycle scrap metal to foundry or for sale $3,000 $600
WV0201 #12 Y:2000 Utilize energy-efficient belts and other improved mechanisms $2,057 $500
WV0201 #11 Y:2000 Chill water to the highest temperature possible $1,887 $40
WV0201 #10 Y:2000 Utilize a less expensive cooling method $1,435 $530
WV0201 #09 Y:2000 Insulate bare equipment $922 $278
WV0201 #08 Y:2000 Change rate schedules or other changes in utility service $11,068 $300
WV0201 #07 Y:2000 Reduce the pressure of compressed air to the minimum required $3,718 $60
WV0201 #06 Y:2000 Install compressor air intakes in coolest locations $2,113 $720
WV0201 #05 Y:2000 Reduce illumination to minimum necessary levels $1,544 $240
WV0201 #04 Y:2000 Establish a predictive maintenance program $4,675 $800
WV0201 #03 Y:2000 Analyze flue gas for proper air/fuel ratio $3,889 $1,000