842
matching recommendationsID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
---|---|---|---|---|---|---|
CC0017 #06 Y:2023 | 06 | 2023 | Use solar heat to make electricty | $139,613 | $1,192,963 |
n/a
|
CC0017 #05 Y:2023 | 05 | 2023 | Make a practice of turning off lights when not needed | $1,525 | - |
n/a
|
CC0017 #04 Y:2023 | 04 | 2023 | Install occupancy sensors | $4,836 | $6,196 |
n/a
|
CC0017 #03 Y:2023 | 03 | 2023 | Turn off equipment when not in use | $6,445 | - |
n/a
|
CC0017 #02 Y:2023 | 02 | 2023 | Utilize higher efficiency lamps and/or ballasts | $3,997 | $8,484 |
n/a
|
CC0017 #01 Y:2023 | 01 | 2023 | Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary | $90,004 | - |
n/a
|
LE0541 #06 Y:2023 | 06 | 2023 | Replace existing hvac unit with high efficiency model | $1,586 | $8,304 | |
LE0541 #05 Y:2023 | 05 | 2023 | Use adjustable frequency drive or multiple speed motors on existing system | $1,345 | $4,836 | |
LE0541 #04 Y:2023 | 04 | 2023 | Eliminate leaks in inert gas and compressed air lines/ valves | $890 | $2,400 | |
LE0541 #03 Y:2023 | 03 | 2023 | Utilize higher efficiency lamps and/or ballasts | $1,846 | $4,210 | |
LE0541 #02 Y:2023 | 02 | 2023 | Reduce the pressure of compressed air to the minimum required | $1,461 | $100 | |
LE0541 #01 Y:2023 | 01 | 2023 | Turn off equipment during breaks, reduce operating time | $856 | - | |
MU0014 #09 Y:2022 | 09 | 2022 | Recover waste heat from equipment | $91 | $261 | |
MU0014 #08 Y:2022 | 08 | 2022 | Turn off equipment when not in use | $109 | - | |
MU0014 #07 Y:2022 | 07 | 2022 | Turn off equipment when not in use | $414 | $349 | |
MU0014 #06 Y:2022 | 06 | 2022 | Use optimum temperature | $1,469 | $155 | |
MU0014 #05 Y:2022 | 05 | 2022 | Utilize higher efficiency lamps and/or ballasts | $4,680 | $4,307 | |
MU0014 #04 Y:2022 | 04 | 2022 | Clean and maintain refrigerant condensers and towers | $6,530 | - | |
MU0014 #03 Y:2022 | 03 | 2022 | Reduce the pressure of compressed air to the minimum required | $8,023 | - | |
MU0014 #02 Y:2022 | 02 | 2022 | Eliminate leaks in inert gas and compressed air lines/ valves | $19,203 | $4,540 |