Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

842

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Miscellaneous fabricated textile products
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
CC0017 #06 Y:2023 Use solar heat to make electricty $139,613 $1,192,963
CC0017 #05 Y:2023 Make a practice of turning off lights when not needed $1,525 -
CC0017 #04 Y:2023 Install occupancy sensors $4,836 $6,196
CC0017 #03 Y:2023 Turn off equipment when not in use $6,445 -
CC0017 #02 Y:2023 Utilize higher efficiency lamps and/or ballasts $3,997 $8,484
CC0017 #01 Y:2023 Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $90,004 -
LE0541 #06 Y:2023 Replace existing hvac unit with high efficiency model $1,586 $8,304
LE0541 #05 Y:2023 Use adjustable frequency drive or multiple speed motors on existing system $1,345 $4,836
LE0541 #04 Y:2023 Eliminate leaks in inert gas and compressed air lines/ valves $890 $2,400
LE0541 #03 Y:2023 Utilize higher efficiency lamps and/or ballasts $1,846 $4,210
LE0541 #02 Y:2023 Reduce the pressure of compressed air to the minimum required $1,461 $100
LE0541 #01 Y:2023 Turn off equipment during breaks, reduce operating time $856 -
MU0014 #09 Y:2022 Recover waste heat from equipment $91 $261
MU0014 #08 Y:2022 Turn off equipment when not in use $109 -
MU0014 #07 Y:2022 Turn off equipment when not in use $414 $349
MU0014 #06 Y:2022 Use optimum temperature $1,469 $155
MU0014 #05 Y:2022 Utilize higher efficiency lamps and/or ballasts $4,680 $4,307
MU0014 #04 Y:2022 Clean and maintain refrigerant condensers and towers $6,530 -
MU0014 #03 Y:2022 Reduce the pressure of compressed air to the minimum required $8,023 -
MU0014 #02 Y:2022 Eliminate leaks in inert gas and compressed air lines/ valves $19,203 $4,540