Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

21

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Carpets and rugs
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
LE0421 #13 Y:2016 Eliminate leaks in inert gas and compressed air lines/ valves $700 $3,500
LE0421 #12 Y:2016 Replace existing hvac unit with high efficiency model $3,515 $16,250
LE0421 #11 Y:2016 Utilize energy-efficient belts and other improved mechanisms $971 $4,320
LE0421 #10 Y:2016 Utilize higher efficiency lamps and/or ballasts $1,106 $4,800
LE0421 #09 Y:2016 Utilize higher efficiency lamps and/or ballasts $1,870 $7,590
LE0421 #08 Y:2016 Analyze flue gas for proper air/fuel ratio $697 $2,000
LE0421 #07 Y:2016 Use adjustable frequency drive or multiple speed motors on existing system $4,592 $9,000
LE0421 #06 Y:2016 Install compressor air intakes in coolest locations $550 $1,000
LE0421 #05 Y:2016 Eliminate leaks in inert gas and compressed air lines/ valves $2,141 $3,125
LE0421 #04 Y:2016 Install occupancy sensors $965 $725
LE0421 #03 Y:2016 Install timers and/or thermostats $2,781 $1,800
LE0421 #02 Y:2016 Eliminate leaks in inert gas and compressed air lines/ valves $3,883 $1,000
LE0421 #01 Y:2016 Install occupancy sensors $14,759 $2,175
HO0053 #08 Y:1993 Optimize plant power factor $8,740 $6,990
HO0053 #07 Y:1993 Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $168,361 $700,000
HO0053 #06 Y:1993 Install / repair insulation on steam lines $570 $461
HO0053 #05 Y:1993 Install compressor air intakes in coolest locations $2,072 $1,000
HO0053 #04 Y:1993 Use most efficient type of electric motors $1,255 $2,804
HO0053 #03 Y:1993 Utilize higher efficiency lamps and/or ballasts $2,514 $6,400
HO0053 #02 Y:1993 Utilize higher efficiency lamps and/or ballasts $3,598 $6,829