50
matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| UD1042 #07 Y:2022 | 07 | 2022 | Install occupancy sensors | $3,096 | $3,000 | |
| UD1042 #06 Y:2022 | 06 | 2022 | Utilize higher efficiency lamps and/or ballasts | $4,761 | $14,000 | |
| UD1042 #05 Y:2022 | 05 | 2022 | Optimize plant power factor | $301,346 | $63,514 | |
| UD1042 #04 Y:2022 | 04 | 2022 | Reduce space conditioning during non-working hours | $3,724 | $3,750 | |
| UD1042 #03 Y:2022 | 03 | 2022 | Reduce space conditioning during non-working hours | $19,440 | - | |
| UD1042 #02 Y:2022 | 02 | 2022 | Reduce ventilation air | $10,167 | - | |
| UD1042 #01 Y:2022 | 01 | 2022 | Utilize energy-efficient belts and other improved mechanisms | $15,033 | - | |
| UD0780 #13 Y:2008 | 13 | 2008 | Eliminate leaks in inert gas and compressed air lines/ valves | $5,234 | $1,000 | |
| UD0780 #12 Y:2008 | 12 | 2008 | Increase amount of condensate returned | $2,587 | $950 | |
| UD0780 #11 Y:2008 | 11 | 2008 | Reduce the pressure of compressed air to the minimum required | $2,749 | $1,500 | |
| UD0780 #10 Y:2008 | 10 | 2008 | Use adjustable frequency drive or multiple speed motors on existing system | $3,382 | $12,224 | |
| UD0780 #09 Y:2008 | 09 | 2008 | Repair and eliminate steam leaks | $4,058 | $700 | |
| UD0780 #08 Y:2008 | 08 | 2008 | Utilize higher efficiency lamps and/or ballasts | $5,293 | $10,770 | |
| UD0780 #07 Y:2008 | 07 | 2008 | Analyze flue gas for proper air/fuel ratio | $5,689 | - | |
| UD0780 #06 Y:2008 | 06 | 2008 | Use closed cycle process to minimize waste water production | $6,428 | $4,000 | |
| UD0780 #05 Y:2008 | 05 | 2008 | Use waste heat from hot flue gases to preheat | $12,375 | $30,000 | |
| UD0780 #04 Y:2008 | 04 | 2008 | Increase amount of condensate returned | $12,693 | $7,000 | |
| UD0780 #03 Y:2008 | 03 | 2008 | Enhance sensitivity of temperature control and cutoff | $14,100 | $18,000 | |
| UD0780 #02 Y:2008 | 02 | 2008 | Flash condensate to produce lower pressure steam | $28,671 | $23,190 | |
| UD0780 #01 Y:2008 | 01 | 2008 | Insulate bare equipment | $31,350 | $8,290 |