Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

14

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Natural, processed, and imitation cheese
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UK1405 #14 Y:2014 Utilize energy-efficient belts and other improved mechanisms $103 $30
UK1405 #13 Y:2014 Install compressor air intakes in coolest locations $2,369 -
UK1405 #12 Y:2014 Insulate feedwater tank $3,480 $1,769
UK1405 #11 Y:2014 Upgrade controls on compressors $8,300 $25,000
UK1405 #10 Y:2014 Analyze flue gas for proper air/fuel ratio $13,374 $24,100
UK1405 #09 Y:2014 Recover waste heat from equipment $15,146 $1,540
UK1405 #08 Y:2014 Utilize higher efficiency lamps and/or ballasts $19,745 $46,464
UK1405 #07 Y:2014 Optimize plant power factor $20,457 $15,610
UK1405 #06 Y:2014 Repair and eliminate steam leaks $27,426 $2,678
UK1405 #05 Y:2014 Change rate schedules or other changes in utility service $28,307 -
UK1405 #04 Y:2014 Preheat combustion air with waste heat $32,296 $39,600
UK1405 #03 Y:2014 Change rate schedules or other changes in utility service $33,427 -
UK1405 #02 Y:2014 Use fossil fuel powered generator during peak demand periods $194,446 $20,000
UK1405 #01 Y:2014 Use other waste concentration methods $200,000 -