Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

21

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Executive and legislative offices, combined
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
ORC014 #03 Y:2024 Interlock heating and air conditioning systems to prevent simultaneous operation $2,420 $12,690
ORC014 #02 Y:2024 Install occupancy sensors $4,418 $448
ORC014 #01 Y:2024 Utilize higher efficiency lamps and/or ballasts $5,533 $131,106
ORC009 #05 Y:2023 Install occupancy sensors $307 $200
ORC009 #04 Y:2023 Ventilation system to shut off when room is not in use $83 $400
ORC009 #03 Y:2023 Install vinyl strip / high speed / air curtain doors $178 $500
ORC009 #02 Y:2023 Replace boiler $1,624 $10,000
ORC009 #01 Y:2023 Use adjustable frequency drive or multiple speed motors on existing system $654 $2,000
ORC008 #06 Y:2023 Utilize controls to operate equipment only when needed $1,574 $500
ORC008 #05 Y:2023 Use heat pump for space conditioning $668 $5,000
ORC008 #04 Y:2023 Use adjustable frequency drive or multiple speed motors on existing system $1,527 $4,000
ORC008 #03 Y:2023 Utilize daylight whenever possible in lieu of artificial light $959 $1,500
ORC008 #02 Y:2023 Install occupancy sensors $474 $100
ORC008 #01 Y:2023 Install timers on light switches in little used areas $2,876 $500
AS0524 #07 Y:2022 Close holes and openings in building such as broken windows $151 $149
AS0524 #06 Y:2022 Install spectral reflectors / delamp $193 $54
AS0524 #05 Y:2022 Shade windows from summer sun $1,064 $5,010
AS0524 #04 Y:2022 Install heat pipes / raise cooling setpoint $1,682 $742
AS0524 #03 Y:2022 Change rate schedules or other changes in utility service $1,785 $200
AS0524 #02 Y:2022 Install timers on light switches in little used areas $1,878 $2,400