17
matching recommendations
$
$
ARC | 2+ Digits Required | |
NAICS | All other publishers | |
SIC | 2+ Digits Required | |
3+ Characters Required for Products |
ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
---|---|---|---|---|---|---|
UD0800 #10 Y:2009 | 10 | 2009 | Reduce the pressure of compressed air to the minimum required | $162 | $250 | |
UD0800 #09 Y:2009 | 09 | 2009 | Meter recycled water (to reduce sewer charges) | $330 | $300 | |
UD0800 #08 Y:2009 | 08 | 2009 | Eliminate leaks in inert gas and compressed air lines/ valves | $444 | $1,000 | |
UD0800 #07 Y:2009 | 07 | 2009 | Utilize higher efficiency lamps and/or ballasts | $700 | $4,239 | |
UD0800 #06 Y:2009 | 06 | 2009 | Utilize energy-efficient belts and other improved mechanisms | $1,306 | - | |
UD0800 #05 Y:2009 | 05 | 2009 | Reduce space conditioning during non-working hours | $3,892 | $2,000 | |
UD0800 #04 Y:2009 | 04 | 2009 | Reduce space conditioning during non-working hours | $6,047 | - | |
UD0800 #03 Y:2009 | 03 | 2009 | Use computer programs to optimize hvac performance | $18,713 | $7,500 | |
UD0800 #02 Y:2009 | 02 | 2009 | Replace existing hvac unit with high efficiency model | $27,253 | $138,000 | |
UD0800 #01 Y:2009 | 01 | 2009 | Reschedule plant operations or reduce load to avoid peaks | $42,596 | - | |
BD0294 #07 Y:2005 | 07 | 2005 | Re-arrange equipment layout to reduce labor costs | $8,840 | $3,000 | |
BD0294 #06 Y:2005 | 06 | 2005 | Re-arrange equipment layout to reduce labor costs | $13,260 | $2,000 | |
BD0294 #05 Y:2005 | 05 | 2005 | Expand operations into unused space | $40,952 | $20,000 | |
BD0294 #04 Y:2005 | 04 | 2005 | Install automatic packing equipment | $41,600 | $22,000 | |
BD0294 #03 Y:2005 | 03 | 2005 | Insulate bare equipment | $599 | $263 | |
BD0294 #02 Y:2005 | 02 | 2005 | Install occupancy sensors | $1,291 | $750 | |
BD0294 #01 Y:2005 | 01 | 2005 | Utilize controls to operate equipment only when needed | $7,821 | $400 |