Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

226

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Warehousing and storage
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UD1108 #02 Y:2025 Utilize higher efficiency lamps and/or ballasts $14,247 $34,400
UD1108 #01 Y:2025 Utilize higher efficiency lamps and/or ballasts $2,982 $14,400
CI0046 #06 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $20,340 $10,000
CI0046 #05 Y:2025 Repair faulty insulation in furnaces, boilers, etc $83,773 $30,000
CI0046 #04 Y:2025 Provide proper maintenance of motor driven equipment $91,633 $10,000
CI0046 #03 Y:2025 Recharge batteries on during off-peak demand periods $117,094 $122,400
CI0046 #02 Y:2025 Install vinyl strip / high speed / air curtain doors $121,817 $500,000
CI0046 #01 Y:2025 Install vinyl strip / high speed / air curtain doors $156,899 $330,000
AS0602 #05 Y:2025 Install timers and/or thermostats $344 $1,177
AS0602 #04 Y:2025 Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $1,370 $190
AS0602 #03 Y:2025 Utilize higher efficiency lamps and/or ballasts $2,324 $3,612
AS0602 #02 Y:2025 Begin a practice of predictive / preventative maintenance $2,890 $1,470
AS0602 #01 Y:2025 Close holes and openings in building such as broken windows $6,811 $689
UD1106 #03 Y:2024 Install vinyl strip / high speed / air curtain doors $11,902 $8,000
UD1106 #02 Y:2024 Use proper thickness of insulation on building envelope $411 $1,920
UD1106 #01 Y:2024 Lower temperature during the winter season and vice-versa $14,990 -
AS0593 #11 Y:2024 Install occupancy sensors $189 $180
AS0593 #10 Y:2024 Install heat pipes / raise cooling setpoint $370 $90
AS0593 #09 Y:2024 Change rate schedules or other changes in utility service $481 $120
AS0593 #08 Y:2024 Conserve energy by efficient use of vending machines $1,045 $715