Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,341

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Other motor vehicle parts manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
IA0433 #08 Y:2008 Reduce space conditioning during non-working hours $587 $142
IA0433 #07 Y:2008 Install outside air damper / economizer on hvac unit $3,364 $4,000
IA0433 #06 Y:2008 Utilize higher efficiency lamps and/or ballasts $20,324 $37,346
IA0433 #05 Y:2008 Recover waste heat from equipment $13,871 $1,700
IA0433 #04 Y:2008 Reduce the pressure of compressed air to the minimum required $1,195 $54
IA0433 #03 Y:2008 Install compressor air intakes in coolest locations $1,886 $832
IA0433 #02 Y:2008 Eliminate leaks in inert gas and compressed air lines/ valves $4,622 $459
IA0433 #01 Y:2008 Replace fossil fuel equipment with electrical equipment $52,036 -
SF0358 #16 Y:2008 Replace existing hvac unit with high efficiency model $6,581 $35,183
SF0358 #15 Y:2008 Utilize higher efficiency lamps and/or ballasts $7,657 $97,375
SF0358 #14 Y:2008 Replace electrically-operated equipment with fossil fuel equipment $14,884 $150,000
SF0358 #13 Y:2008 Insulate bare equipment $2,327 $8,208
SF0358 #12 Y:2008 Turn off equipment when not in use $606 $2,130
SF0358 #11 Y:2008 Replace electrically-operated equipment with fossil fuel equipment $1,117 $2,180
SF0358 #10 Y:2008 Install occupancy sensors $11,328 $26,035
SF0358 #09 Y:2008 Use most efficient type of electric motors $1,062 $2,259
SF0358 #08 Y:2008 Use adjustable frequency drive or multiple speed motors on existing system $2,224 $5,375
SF0358 #07 Y:2008 Turn off equipment when not in use $351 $230
SF0358 #06 Y:2008 Use adjustable frequency drive or multiple speed motors on existing system $7,827 $8,406
SF0358 #05 Y:2008 Utilize energy-efficient belts and other improved mechanisms $180 $97