Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,258

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Other motor vehicle parts manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
TR0059 #04 Y:2024 Meter waste water $5,966 $1,570
TR0059 #03 Y:2024 Apply for tax-free status for energy purchases $18,395 $4,000
TR0059 #02 Y:2024 Use solar heat to make electricty $148,771 $739,065
TR0059 #01 Y:2024 Cool compressor air intake with heat exchanger $36,781 $32,522
UD1092 #05 Y:2024 Eliminate or reduce compressed air usage $23,052 $34,302
UD1092 #04 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $60,291 -
UD1092 #03 Y:2024 Install outside air damper / economizer on hvac unit $16,477 $5,670
UD1092 #02 Y:2024 Use closed cycle process to minimize waste water production $6,755 -
UD1092 #01 Y:2024 Turn off equipment when not in use $26,516 -
UA0289 #10 Y:2024 Install timers and/or thermostats $1,219 $79
UA0289 #09 Y:2024 Improve air circulation with destratification fans / other methods $48,585 $5,495
UA0289 #08 Y:2024 Replace existing hvac unit with high efficiency model $218,857 $1,056,464
UA0289 #07 Y:2024 Install occupancy sensors $4,334 $6,800
UA0289 #06 Y:2024 Utilize higher efficiency lamps and/or ballasts $5,369 $17,266
UA0289 #05 Y:2024 Recover waste heat from equipment $3,789 $22,563
UA0289 #04 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $26,555 $8,591
UA0289 #03 Y:2024 Reduce the pressure of compressed air to the minimum required $19,427 $1,000
UA0289 #02 Y:2024 Optimize plant power factor $6,141 $6,733
UA0289 #01 Y:2024 Use solar heat to make electricty $330,998 $8,608,788
MS0434 #04 Y:2024 Use solar heat to make electricty $35,214 $329,875