Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

7,318

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Transportation equipment manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
WM0259 #05 Y:2026 Install spectral reflectors / delamp $265 -
WM0259 #04 Y:2026 Install adequate dryers on air lines to eliminate blowdown $1,514 $1,508
WM0259 #03 Y:2026 Use waste heat from hot flue gases to preheat incoming fluids $24,491 $20,000
WM0259 #02 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $46,427 $10,000
WM0259 #01 Y:2026 Reschedule plant operations or reduce load to avoid peaks $134,432 -
NT0058 #08 Y:2026 Lower temperature during the winter season and vice-versa $2,475 -
NT0058 #07 Y:2026 Optimize plant power factor $3,187 $2,003
NT0058 #06 Y:2026 Utilize higher efficiency lamps and/or ballasts $3,608 $6,871
NT0058 #05 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $5,489 $5,753
NT0058 #04 Y:2026 Apply for tax-free status for energy purchases $18,987 $5,000
NT0058 #03 Y:2026 Keep doors and windows shut when not on use $47,399 -
NT0058 #02 Y:2026 Replace existing hvac unit with high efficiency model $105,430 $139,090
NT0058 #01 Y:2026 Upgrade obsolete equipment $169,994 $103,634
LS2604 #03 Y:2026 Utilize higher efficiency lamps and/or ballasts $1,863 $4,385
LS2604 #02 Y:2026 Utilize daylight whenever possible in lieu of artificial light $823 $125
LS2604 #01 Y:2026 Clean and maintain refrigerant condensers and towers $3,713 $1,000
UC2601 #10 Y:2026 Optimize plant power factor $8,766 $30,464
UC2601 #09 Y:2026 Make a practice of turning off lights when not needed $4,711 -
UC2601 #08 Y:2026 Install occupancy sensors $12,838 $3,840
UC2601 #07 Y:2026 Insulate bare equipment $11,998 $7,750