Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

7,126

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Transportation equipment manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
NT0052 #05 Y:2025 Lower light fixtures in high ceiling areas $400,000 $112,035
NT0052 #04 Y:2025 Purchase new equipment to reduce material use / cost $180,689 $135,000
NT0052 #03 Y:2025 Replace existing hvac unit with high efficiency model $110,740 $106,736
NT0052 #02 Y:2025 Reduce the pressure of compressed air to the minimum required $6,191 -
NT0052 #01 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $8,372 $5,609
MI0464 #06 Y:2025 Turn off equipment when not in use $1,948 $2,600
MI0464 #05 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $7,193 $1,665
MI0464 #04 Y:2025 Air condition only space necessary $5,341 $960
MI0464 #03 Y:2025 Close holes and openings in building such as broken windows $5,173 $485
MI0464 #02 Y:2025 Utilize controls to operate equipment only when needed $3,243 -
MI0464 #01 Y:2025 Lower temperature during the winter season and vice-versa $2,522 -
MS0455 #04 Y:2025 Reduce delivery schedules $170,400 $21,600
MS0455 #03 Y:2025 Implement a regular maintenance program to reduce emissions from leaky valves and pipe fittings $675 $2,667
MS0455 #02 Y:2025 Use solar heat to make electricty $17,043 $161,000
MS0455 #01 Y:2025 Replace fossil fuel equipment with electrical equipment $15,878 $75,000
UA0299 #07 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $3,647 $7,759
UA0299 #06 Y:2025 Utilize energy-efficient belts and other improved mechanisms $2,885 $2,349
UA0299 #05 Y:2025 Turn off equipment when not in use $7,332 $4,020
UA0299 #04 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $5,103 $10,944
UA0299 #03 Y:2025 Install timers and/or thermostats $10,720 $241