9
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | Primary battery manufacturing | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| IP0085 #09 Y:2017 | 09 | 2017 | Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat | $448,362 | $2,150,000 | |
| IP0085 #08 Y:2017 | 08 | 2017 | Use adjustable frequency drive or multiple speed motors on existing system | $989 | $804 | |
| IP0085 #07 Y:2017 | 07 | 2017 | Upgrade controls on compressors | $18,232 | $10,662 | |
| IP0085 #06 Y:2017 | 06 | 2017 | Shut off cooling if cold outside air will cool process | $5,250 | $2,002 | |
| IP0085 #05 Y:2017 | 05 | 2017 | Install compressor air intakes in coolest locations | $4,570 | $963 | |
| IP0085 #04 Y:2017 | 04 | 2017 | Eliminate leaks in inert gas and compressed air lines/ valves | $2,588 | $155 | |
| IP0085 #03 Y:2017 | 03 | 2017 | Modify refrigeration system to operate at a lower pressure | $13,004 | $4 | |
| IP0085 #02 Y:2017 | 02 | 2017 | Re-size charging openings or add movable cover or door | $1,244 | $6 | |
| IP0085 #01 Y:2017 | 01 | 2017 | Conserve energy by efficient use of vending machines | $1,359 | - |