22
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | Totalizing fluid meter and counting device manufacturing | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| WV0591 #12 Y:2019 | 12 | 2019 | Insulate bare equipment | $98 | $360 | |
| WV0591 #11 Y:2019 | 11 | 2019 | Insulate bare equipment | $151 | $373 | |
| WV0591 #10 Y:2019 | 10 | 2019 | Analyze flue gas for proper air/fuel ratio | $507 | $2,500 | |
| WV0591 #09 Y:2019 | 09 | 2019 | Develop a repair/replace policy | $944 | $338 | |
| WV0591 #08 Y:2019 | 08 | 2019 | Reduce the pressure of compressed air to the minimum required | $834 | $50 | |
| WV0591 #07 Y:2019 | 07 | 2019 | Use heat in flue gases to preheat products or materials | $1,752 | $4,700 | |
| WV0591 #06 Y:2019 | 06 | 2019 | Install compressor air intakes in coolest locations | $1,896 | $1,770 | |
| WV0591 #05 Y:2019 | 05 | 2019 | Reduce the pressure of compressed air to the minimum required | $2,647 | $958 | |
| WV0591 #04 Y:2019 | 04 | 2019 | Eliminate leaks in inert gas and compressed air lines/ valves | $3,574 | $1,468 | |
| WV0591 #03 Y:2019 | 03 | 2019 | Install occupancy sensors | $4,927 | $4,625 | |
| WV0591 #02 Y:2019 | 02 | 2019 | Upgrade controls on compressors | $6,029 | $6,375 | |
| WV0591 #01 Y:2019 | 01 | 2019 | Adjust burners for efficient operation | $10,092 | $27,700 | |
| LE0384 #10 Y:2014 | 10 | 2014 | Replace broken windows and/or window sash | $7,346 | $551,550 | |
| LE0384 #09 Y:2014 | 09 | 2014 | Utilize higher efficiency lamps and/or ballasts | $5,397 | $30,000 | |
| LE0384 #08 Y:2014 | 08 | 2014 | Install timers and/or thermostats | $3,342 | $234 | |
| LE0384 #07 Y:2014 | 07 | 2014 | Utilize higher efficiency lamps and/or ballasts | $2,620 | $12,950 | |
| LE0384 #06 Y:2014 | 06 | 2014 | Utilize higher efficiency lamps and/or ballasts | $1,875 | $3,304 | |
| LE0384 #05 Y:2014 | 05 | 2014 | Use properly designed and sized hvac equipment | $46,884 | $80,000 | |
| LE0384 #04 Y:2014 | 04 | 2014 | Utilize higher efficiency lamps and/or ballasts | $1,878 | $2,080 | |
| LE0384 #03 Y:2014 | 03 | 2014 | Install or upgrade insulation on hvac distribution systems | $1,284 | $1,010 |