Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

345

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Printed circuit assembly (electronic assembly) manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
AS0439 #04 Y:2017 Maintain machines to reduce leaks $734 $545
AS0439 #03 Y:2017 Install compressor air intakes in coolest locations $1,293 $950
AS0439 #02 Y:2017 Use adjustable frequency drive or multiple speed motors on existing system $14,146 $4,770
AS0439 #01 Y:2017 Install occupancy sensors $629 $650
MI0294 #17 Y:2016 Reduce illumination to minimum necessary levels $124 $340
MI0294 #16 Y:2016 Install vinyl strip / high speed / air curtain doors $342 $375
MI0294 #15 Y:2016 Reduce illumination to minimum necessary levels $502 $760
MI0294 #14 Y:2016 Install vinyl strip / high speed / air curtain doors $502 $1,624
MI0294 #13 Y:2016 Increase amount of waste recovered for resale $1,012 $800
MI0294 #12 Y:2016 Install occupancy sensors $1,209 $1,237
MI0294 #11 Y:2016 Reduce the pressure of compressed air to the minimum required $1,797 $40
MI0294 #10 Y:2016 Utilize higher efficiency lamps and/or ballasts $3,176 $7,505
MI0294 #09 Y:2016 Utilize higher efficiency lamps and/or ballasts $3,218 $12,637
MI0294 #08 Y:2016 Lower temperature during the winter season and vice-versa $3,830 $40
MI0294 #07 Y:2016 Clean or color roof to reduce solar load $4,081 $4,200
MI0294 #06 Y:2016 Condense operation into one building $5,648 $1,360
MI0294 #05 Y:2016 Reduce infiltration to refrigerated areas; isolate hot equipment from refrigerated areas $5,921 $1,441
MI0294 #04 Y:2016 Eliminate leaks in inert gas and compressed air lines/ valves $7,388 $1,660
MI0294 #03 Y:2016 Use computer programs to optimize hvac performance $8,706 $5,161
MI0294 #02 Y:2016 Use adjustable frequency drive or multiple speed motors on existing system $42,734 $29,594