Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

85

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Air and gas compressor manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
NT0031 #05 Y:2024 Apply for investment incentives $6,219 $10,000
NT0031 #04 Y:2024 Utilize higher efficiency lamps and/or ballasts $1,218 $3,621
NT0031 #03 Y:2024 Use / purchase optimum sized compressor $150,000 $20,430
NT0031 #02 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $1,036 $4,553
NT0031 #01 Y:2024 Turn off equipment when not in use $18,170 -
UD1058 #08 Y:2023 Install occupancy sensors $949 $290
UD1058 #07 Y:2023 Utilize higher efficiency lamps and/or ballasts $34,307 $29,827
UD1058 #06 Y:2023 Install vinyl strip / high speed / air curtain doors $1,653 $1,115
UD1058 #05 Y:2023 Eliminate leaks in inert gas and compressed air lines/ valves $7,636 $952
UD1058 #04 Y:2023 Eliminate or reduce compressed air usage $10,990 $11,117
UD1058 #03 Y:2023 Utilize energy-efficient belts and other improved mechanisms $329 -
UD1058 #02 Y:2023 Reschedule plant operations or reduce load to avoid peaks $282 -
UD1058 #01 Y:2023 Reschedule plant operations or reduce load to avoid peaks $23,188 -
SU0531 #11 Y:2023 Install compressor air intakes in coolest locations $1,818 $8,523
SU0531 #10 Y:2023 Use proper thickness of insulation on building envelope $1,531 $2,041
SU0531 #09 Y:2023 Recover waste heat from equipment $428 $528
SU0531 #08 Y:2023 Use solar heat to make electricty $32,789 $29,395
SU0531 #07 Y:2023 Install vinyl strip / high speed / air curtain doors $1,355 $156
SU0531 #06 Y:2023 Utilize higher efficiency lamps and/or ballasts $1,000 $102
SU0531 #05 Y:2023 Use or replace with energy efficient substitutes $1,436 $70