16
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | Air-conditioning and warm air heating equipment and commercial and industrial refrigeration equipmen | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| SF0458 #09 Y:2014 | 09 | 2014 | Install equipment (eg compactor) to reduce disposal costs | $4,360 | $37,774 | |
| SF0458 #08 Y:2014 | 08 | 2014 | Reuse / recycle/ sell paper products | $3,900 | - | |
| SF0458 #07 Y:2014 | 07 | 2014 | Install occupancy sensors | $1,683 | $6,142 | |
| SF0458 #06 Y:2014 | 06 | 2014 | Utilize energy-efficient belts and other improved mechanisms | $459 | $1,384 | |
| SF0458 #05 Y:2014 | 05 | 2014 | Utilize higher efficiency lamps and/or ballasts | $15,813 | $30,411 | |
| SF0458 #04 Y:2014 | 04 | 2014 | Interlock heating and air conditioning systems to prevent simultaneous operation | $1,582 | $522 | |
| SF0458 #03 Y:2014 | 03 | 2014 | Turn off equipment when not in use | $2,339 | - | |
| SF0458 #02 Y:2014 | 02 | 2014 | Reschedule plant operations or reduce load to avoid peaks | $1,195 | - | |
| SF0458 #01 Y:2014 | 01 | 2014 | Repair and eliminate steam leaks | $6,859 | $840 | |
| SD0463 #07 Y:2012 | 07 | 2012 | Reschedule plant operations or reduce load to avoid peaks | $467 | $200 | |
| SD0463 #06 Y:2012 | 06 | 2012 | Reduce the pressure of compressed air to the minimum required | $564 | $200 | |
| SD0463 #05 Y:2012 | 05 | 2012 | Clean or color roof to reduce solar load | $2,233 | $5,250 | |
| SD0463 #04 Y:2012 | 04 | 2012 | Install timers on light switches in little used areas | $2,768 | $2,210 | |
| SD0463 #03 Y:2012 | 03 | 2012 | Use photocell controls | $2,625 | $1,850 | |
| SD0463 #02 Y:2012 | 02 | 2012 | Use adjustable frequency drive or multiple speed motors on existing system | $4,131 | $6,224 | |
| SD0463 #01 Y:2012 | 01 | 2012 | Eliminate leaks in inert gas and compressed air lines/ valves | $4,304 | $1,500 |