Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

23

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Spring manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
IP0081 #10 Y:2016 Replace air curtain doors with solid doors $1,766 $3,788
IP0081 #09 Y:2016 Install occupancy sensors $201 $409
IP0081 #08 Y:2016 Utilize higher efficiency lamps and/or ballasts $832 $1,358
IP0081 #07 Y:2016 Enhance sensitivity of temperature control and cutoff $1,643 $1,949
IP0081 #06 Y:2016 Insulate glazing, walls, ceilings, and roofs $25 $17
IP0081 #05 Y:2016 Utilize energy-efficient belts and other improved mechanisms $1,865 $390
IP0081 #04 Y:2016 Eliminate leaks in inert gas and compressed air lines/ valves $2,798 $35
IP0081 #03 Y:2016 Turn off equipment when not in use $72 -
IP0081 #02 Y:2016 Use or replace with energy efficient substitutes $1,216 -
IP0081 #01 Y:2016 Lower temperature during the winter season and vice-versa $1,110 -
IC0107 #13 Y:2005 Utilize higher efficiency lamps and/or ballasts $1,035 $4,016
IC0107 #12 Y:2005 Size electric motors for peak operating efficiency $3,508 $608
IC0107 #11 Y:2005 Use most efficient type of electric motors $2,097 $9,021
IC0107 #10 Y:2005 Reduce the pressure of compressed air to the minimum required $1,309 -
IC0107 #09 Y:2005 Eliminate leaks in inert gas and compressed air lines/ valves $4,560 $1,800
IC0107 #08 Y:2005 Turn off equipment when not in use $358 $262
IC0107 #07 Y:2005 Add equipment/ operators to reduce production bottleneck $799,427 $750,000
IC0107 #06 Y:2005 Use waste heat from hot flue gases to preheat $22,485 $224,000
IC0107 #05 Y:2005 Replace heat treating oven with more efficient unit $13,232 -
IC0107 #04 Y:2005 Re-use or recycle hot or cold process exhaust air $19,487 $61,560