| IP0081 #10 Y:2016 | 10 | 2016 | Replace air curtain doors with solid doors | $1,766 | $3,788 | |
| IP0081 #09 Y:2016 | 09 | 2016 | Install occupancy sensors | $201 | $409 | |
| IP0081 #08 Y:2016 | 08 | 2016 | Utilize higher efficiency lamps and/or ballasts | $832 | $1,358 | |
| IP0081 #07 Y:2016 | 07 | 2016 | Enhance sensitivity of temperature control and cutoff | $1,643 | $1,949 | |
| IP0081 #06 Y:2016 | 06 | 2016 | Insulate glazing, walls, ceilings, and roofs | $25 | $17 | |
| IP0081 #05 Y:2016 | 05 | 2016 | Utilize energy-efficient belts and other improved mechanisms | $1,865 | $390 | |
| IP0081 #04 Y:2016 | 04 | 2016 | Eliminate leaks in inert gas and compressed air lines/ valves | $2,798 | $35 | |
| IP0081 #03 Y:2016 | 03 | 2016 | Turn off equipment when not in use | $72 | - | |
| IP0081 #02 Y:2016 | 02 | 2016 | Use or replace with energy efficient substitutes | $1,216 | - | |
| IP0081 #01 Y:2016 | 01 | 2016 | Lower temperature during the winter season and vice-versa | $1,110 | - | |
| IC0107 #13 Y:2005 | 13 | 2005 | Utilize higher efficiency lamps and/or ballasts | $1,035 | $4,016 | |
| IC0107 #12 Y:2005 | 12 | 2005 | Size electric motors for peak operating efficiency | $3,508 | $608 | |
| IC0107 #11 Y:2005 | 11 | 2005 | Use most efficient type of electric motors | $2,097 | $9,021 | |
| IC0107 #10 Y:2005 | 10 | 2005 | Reduce the pressure of compressed air to the minimum required | $1,309 | - | |
| IC0107 #09 Y:2005 | 09 | 2005 | Eliminate leaks in inert gas and compressed air lines/ valves | $4,560 | $1,800 | |
| IC0107 #08 Y:2005 | 08 | 2005 | Turn off equipment when not in use | $358 | $262 | |
| IC0107 #07 Y:2005 | 07 | 2005 | Add equipment/ operators to reduce production bottleneck | $799,427 | $750,000 | |
| IC0107 #06 Y:2005 | 06 | 2005 | Use waste heat from hot flue gases to preheat | $22,485 | $224,000 | |
| IC0107 #05 Y:2005 | 05 | 2005 | Replace heat treating oven with more efficient unit | $13,232 | - | |
| IC0107 #04 Y:2005 | 04 | 2005 | Re-use or recycle hot or cold process exhaust air | $19,487 | $61,560 |