Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

15

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Iron and steel pipe and tube manufacturing from purchased steel
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UK1403 #15 Y:2014 Meter recycled water (to reduce sewer charges) $34,100 $5,000
UK1403 #14 Y:2014 Eliminate old stock and modify inventory control $318,750 -
UK1403 #13 Y:2014 Upgrade controls on compressors $3,017 -
UK1403 #12 Y:2014 Use photocell controls $3,867 $947
UK1403 #11 Y:2014 Upgrade controls on compressors $14,129 $40,000
UK1403 #10 Y:2014 Eliminate old stock and modify inventory control $250,000 $100,000
UK1403 #09 Y:2014 Eliminate leaks in inert gas and compressed air lines/ valves $50,851 $9,648
UK1403 #08 Y:2014 Minimize water usage $68,700 $5,200
UK1403 #07 Y:2014 Utilize higher efficiency lamps and/or ballasts $132,390 $479,700
UK1403 #06 Y:2014 Reduce illumination to minimum necessary levels $4,405 -
UK1403 #05 Y:2014 Eliminate leaks in water lines and valves $69,620 $7,000
UK1403 #04 Y:2014 Meter recycled water (to reduce sewer charges) $26,100 -
UK1403 #03 Y:2014 Change rate schedules or other changes in utility service $4,250 -
UK1403 #02 Y:2014 Reduce the pressure of compressed air to the minimum required $2,517 -
UK1403 #01 Y:2014 Optimize plant power factor $56,910 $52,500