17
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | Other concrete product manufacturing | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| OR0504 #07 Y:2006 | 07 | 2006 | Turn off equipment during breaks, reduce operating time | $2,500 | $1,000 | |
| OR0504 #06 Y:2006 | 06 | 2006 | Redesign process | $6,100 | $5,000 | |
| OR0504 #05 Y:2006 | 05 | 2006 | Minimize operation of equipment maintained in standby condition | $23,000 | - | |
| OR0504 #04 Y:2006 | 04 | 2006 | Use a less expensive method of waste removal | $28,000 | - | |
| OR0504 #03 Y:2006 | 03 | 2006 | Use a less expensive method of waste removal | $84,100 | - | |
| OR0504 #02 Y:2006 | 02 | 2006 | Replace steam jets on vacuum system with electric motor driven vacuum pumps | $22,500 | $44,500 | |
| OR0504 #01 Y:2006 | 01 | 2006 | Recover heat from exhausted steam, hot air or hot water | $64,300 | $20,000 | |
| UF0385 #10 Y:2006 | 10 | 2006 | Modify workload | $2,785 | $115 | |
| UF0385 #09 Y:2006 | 09 | 2006 | Move product using mechanical means | $6,188 | $600 | |
| UF0385 #08 Y:2006 | 08 | 2006 | Apply for tax-free status for energy purchases | $12,215 | - | |
| UF0385 #07 Y:2006 | 07 | 2006 | Pay utility bills on time | $260 | - | |
| UF0385 #06 Y:2006 | 06 | 2006 | Use compressor air filters | $572 | $138 | |
| UF0385 #05 Y:2006 | 05 | 2006 | Eliminate leaks in inert gas and compressed air lines/ valves | $6,050 | $236 | |
| UF0385 #04 Y:2006 | 04 | 2006 | Maintain air filters by cleaning or replacement | $2,145 | $24 | |
| UF0385 #03 Y:2006 | 03 | 2006 | Eliminate leaks in inert gas and compressed air lines/ valves | $9,469 | $686 | |
| UF0385 #02 Y:2006 | 02 | 2006 | Reduce the pressure of compressed air to the minimum required | $636 | - | |
| UF0385 #01 Y:2006 | 01 | 2006 | Utilize higher efficiency lamps and/or ballasts | $6,322 | $7,864 |