639
matching recommendationsID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
---|---|---|---|---|---|---|
WV0676 #08 Y:2024 | 08 | 2024 | Eliminate or reduce compressed air usage | $49 | $140 |
n/a
|
WV0676 #07 Y:2024 | 07 | 2024 | Upgrade controls on compressors | $329 | $1,415 |
n/a
|
WV0676 #06 Y:2024 | 06 | 2024 | Utilize higher efficiency lamps and/or ballasts | $1,979 | $653 |
n/a
|
WV0676 #05 Y:2024 | 05 | 2024 | Install occupancy sensors | $2,075 | $3,893 |
n/a
|
WV0676 #04 Y:2024 | 04 | 2024 | Develop a repair/replace policy | $3,482 | $1,197 |
n/a
|
WV0676 #03 Y:2024 | 03 | 2024 | Use adjustable frequency drive or multiple speed motors on existing system | $4,750 | $6,504 |
n/a
|
WV0676 #02 Y:2024 | 02 | 2024 | Establish a predictive maintenance program | $4,780 | $5,200 |
n/a
|
WV0676 #01 Y:2024 | 01 | 2024 | Insulate bare equipment | $64,709 | $86,472 |
n/a
|
UL2411 #06 Y:2024 | 06 | 2024 | Use waste heat from hot flue gases to preheat | $35,308 | $50,000 |
n/a
|
UL2411 #05 Y:2024 | 05 | 2024 | Reschedule plant operations or reduce load to avoid peaks | $5,372 | $5,000 |
n/a
|
UL2411 #04 Y:2024 | 04 | 2024 | Use insulation in furnaces to facilitate heating / cooling | $4,053 | $13,653 |
n/a
|
UL2411 #03 Y:2024 | 03 | 2024 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,717 | $1,995 |
n/a
|
UL2411 #02 Y:2024 | 02 | 2024 | Lower temperature during the winter season and vice-versa | $746 | $2,700 |
n/a
|
UL2411 #01 Y:2024 | 01 | 2024 | Use solar heat to make electricty | $76,606 | $698,579 |
n/a
|
LE0570 #06 Y:2024 | 06 | 2024 | Install back-up equipment | $46,731 | $90,000 |
n/a
|
LE0570 #05 Y:2024 | 05 | 2024 | Install compressor air intakes in coolest locations | $4,252 | $5,000 |
n/a
|
LE0570 #04 Y:2024 | 04 | 2024 | Reduce the pressure of compressed air to the minimum required | $25,168 | $26,500 |
n/a
|
LE0570 #03 Y:2024 | 03 | 2024 | Use adjustable frequency drive or multiple speed motors on existing system | $55,246 | $42,000 |
n/a
|
LE0570 #02 Y:2024 | 02 | 2024 | Use adjustable frequency drive or multiple speed motors on existing system | $33,515 | $15,000 |
n/a
|
LE0570 #01 Y:2024 | 01 | 2024 | Reschedule plant operations or reduce load to avoid peaks | $9,292 | - |
n/a
|