Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

713

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Cement and concrete product manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UL2615 #04 Y:2026 Use solar heat to make electricty $33,051 $262,820
UL2615 #03 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $13,910 $18,224
UL2615 #02 Y:2026 Utilize higher efficiency lamps and/or ballasts $1,206 $1,761
UL2615 #01 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $3,149 $525
UW2606 #05 Y:2026 Use battery storage for demand control $20,950 $12,248
UW2606 #04 Y:2026 Install vinyl strip / high speed / air curtain doors $3,667 $22,869
UW2606 #03 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $4,223 $5,000
UW2606 #02 Y:2026 Use proper thickness of insulation on building envelope $2,869 $7,446
UW2606 #01 Y:2026 Utilize higher efficiency lamps and/or ballasts $2,138 $4,166
UW2605 #03 Y:2026 Use battery storage for demand control $66,512 $112,906
UW2605 #02 Y:2026 Use most efficient type of electric motors $14,690 $54,208
UW2605 #01 Y:2026 Replace existing equipment with more suitable substitutes $150,000 $900,000
UU0286 #05 Y:2025 Utilize higher efficiency lamps and/or ballasts $2,200 $15,740
UU0286 #04 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $1,270 $1,800
UU0286 #03 Y:2025 Replace fossil fuel equipment with electrical equipment $18,569 $141,050
UU0286 #02 Y:2025 Utilize controls to operate equipment only when needed $59,940 $100,340
UU0286 #01 Y:2025 Increase efficiency of trucks $126,055 $584,355
MZ0385 #07 Y:2025 Meter recycled water (to reduce sewer charges) $6,073 $110,000
MZ0385 #06 Y:2025 Eliminate or reduce compressed air usage $747 $440
MZ0385 #05 Y:2025 Utilize energy-efficient belts and other improved mechanisms $288 -