Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

688

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Cement and concrete product manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UU0286 #05 Y:2025 Utilize higher efficiency lamps and/or ballasts $2,200 $15,740
UU0286 #04 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $1,270 $1,800
UU0286 #03 Y:2025 Replace fossil fuel equipment with electrical equipment $18,569 $141,050
UU0286 #02 Y:2025 Utilize controls to operate equipment only when needed $59,940 $100,340
UU0286 #01 Y:2025 Increase efficiency of trucks $126,055 $584,355
MZ0385 #07 Y:2025 Meter recycled water (to reduce sewer charges) $6,073 $110,000
MZ0385 #06 Y:2025 Eliminate or reduce compressed air usage $747 $440
MZ0385 #05 Y:2025 Utilize energy-efficient belts and other improved mechanisms $288 -
MZ0385 #04 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $1,362 $450
MZ0385 #03 Y:2025 Utilize higher efficiency lamps and/or ballasts $1,394 $4,214
MZ0385 #02 Y:2025 Install occupancy sensors $320 $415
MZ0385 #01 Y:2025 Replace existing hvac unit with high efficiency model $2,048 $15,495
SD0680 #07 Y:2025 Use insulation in furnaces to facilitate heating / cooling $3,261 $2,066
SD0680 #06 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $13,594 $7,158
SD0680 #05 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $25 $85
SD0680 #04 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $938 $1,623
SD0680 #03 Y:2025 Use most efficient type of electric motors $68,636 $26,246
SD0680 #02 Y:2025 Use battery storage for demand control $314,069 $13,401
SD0680 #01 Y:2025 Use solar heat to make electricty $24,191 $55,932
NT0042 #06 Y:2025 Apply for tax-free status for energy purchases $19,525 $5,000