Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

206

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Nonmetallic mineral product manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
AM0960 #04 Y:2025 Use solar heat to make electricty $80,488 $1,250,900
AM0960 #03 Y:2025 Re-size charging openings or add a movable door on equipment $1,654 $204
AM0960 #02 Y:2025 Schedule baking times of small and large components $2,820 $50
AM0960 #01 Y:2025 Optimize plant power factor $47,713 $27,900
NT0042 #06 Y:2025 Apply for tax-free status for energy purchases $19,525 $5,000
NT0042 #05 Y:2025 Lower temperature during the winter season and vice-versa $1,625 $603
NT0042 #04 Y:2025 Reduce the pressure of compressed air to the minimum required $28,561 -
NT0042 #03 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $2,317 $5,609
NT0042 #02 Y:2025 Install occupancy sensors $146 $142
NT0042 #01 Y:2025 Utilize higher efficiency lamps and/or ballasts $1,093 $2,408
NT0041 #07 Y:2025 Apply for tax-free status for energy purchases $10,577 $5,000
NT0041 #06 Y:2025 Use or replace with energy efficient substitutes $187,425 $55,173
NT0041 #05 Y:2025 Analyze flue gas for proper air/fuel ratio $1,667 $1,258
NT0041 #04 Y:2025 Upgrade controls on compressors $8,034 $5,064
NT0041 #03 Y:2025 Reduce the pressure of compressed air to the minimum required $3,280 -
NT0041 #02 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $3,213 $5,609
NT0041 #01 Y:2025 Utilize higher efficiency lamps and/or ballasts $1,213 $1,322
NT0012 #06 Y:2023 Reduce scrap production $80,000 $20,000
NT0012 #05 Y:2023 Lower temperature during the winter season and vice-versa $335 -
NT0012 #04 Y:2023 Regrind, reuse, or sell scrap plastic parts $13,612 -