24
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | Laminated plastics plate, sheet (except packaging), and shape manufacturing | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| UD0820 #14 Y:2010 | 14 | 2010 | Use radiant heater for spot heating | $4,962 | $4,550 | |
| UD0820 #13 Y:2010 | 13 | 2010 | Replace air curtain doors with solid doors | $7,994 | $45,000 | |
| UD0820 #12 Y:2010 | 12 | 2010 | Recover waste heat from equipment | $34,849 | $39,289 | |
| UD0820 #11 Y:2010 | 11 | 2010 | Insulate bare equipment | $3,075 | $8,700 | |
| UD0820 #10 Y:2010 | 10 | 2010 | Improve combustion control capability | $17,532 | $7,000 | |
| UD0820 #09 Y:2010 | 09 | 2010 | Use or replace with energy efficient substitutes | $513 | $1,580 | |
| UD0820 #08 Y:2010 | 08 | 2010 | Eliminate leaks in inert gas and compressed air lines/ valves | $535 | $500 | |
| UD0820 #07 Y:2010 | 07 | 2010 | Install occupancy sensors | $50 | $45 | |
| UD0820 #06 Y:2010 | 06 | 2010 | Utilize higher efficiency lamps and/or ballasts | $1,316 | $2,585 | |
| UD0820 #05 Y:2010 | 05 | 2010 | Utilize higher efficiency lamps and/or ballasts | $1,925 | $4,465 | |
| UD0820 #04 Y:2010 | 04 | 2010 | Utilize higher efficiency lamps and/or ballasts | $3,757 | $4,868 | |
| UD0820 #03 Y:2010 | 03 | 2010 | Utilize higher efficiency lamps and/or ballasts | $6,408 | $5,940 | |
| UD0820 #02 Y:2010 | 02 | 2010 | Utilize energy-efficient belts and other improved mechanisms | $644 | $1 | |
| UD0820 #01 Y:2010 | 01 | 2010 | Reschedule plant operations or reduce load to avoid peaks | $27,511 | $30,000 | |
| UD0728 #10 Y:2005 | 10 | 2005 | Eliminate or reduce compressed air usage | $1,141 | $2,500 | |
| UD0728 #09 Y:2005 | 09 | 2005 | Utilize energy-efficient belts and other improved mechanisms | $1,237 | - | |
| UD0728 #08 Y:2005 | 08 | 2005 | Install occupancy sensors | $2,677 | $1,600 | |
| UD0728 #07 Y:2005 | 07 | 2005 | Reduce fluid flow rates | $3,226 | - | |
| UD0728 #06 Y:2005 | 06 | 2005 | Install compressor air intakes in coolest locations | $3,243 | $1,080 | |
| UD0728 #05 Y:2005 | 05 | 2005 | Reduce fluid flow rates | $6,270 | $22,000 |