13
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | Toilet preparation manufacturing | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| IP0113 #13 Y:2018 | 13 | 2018 | Use waste heat from hot flue gases to preheat | $4,555 | $21,000 | |
| IP0113 #12 Y:2018 | 12 | 2018 | Recover waste heat from equipment | $892 | $2,129 | |
| IP0113 #11 Y:2018 | 11 | 2018 | Utilize higher efficiency lamps and/or ballasts | $476 | $1,343 | |
| IP0113 #10 Y:2018 | 10 | 2018 | Utilize controls to operate equipment only when needed | $775 | $765 | |
| IP0113 #09 Y:2018 | 09 | 2018 | Optimize plant power factor | $1,564 | $876 | |
| IP0113 #08 Y:2018 | 08 | 2018 | Install occupancy sensors | $591 | $501 | |
| IP0113 #07 Y:2018 | 07 | 2018 | Use photocell controls | $151 | $71 | |
| IP0113 #06 Y:2018 | 06 | 2018 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,196 | $72 | |
| IP0113 #05 Y:2018 | 05 | 2018 | Use or replace with energy efficient substitutes | $629 | - | |
| IP0113 #04 Y:2018 | 04 | 2018 | Change rate schedules or other changes in utility service | $783 | - | |
| IP0113 #03 Y:2018 | 03 | 2018 | Reduce the pressure of compressed air to the minimum required | $1,595 | $4 | |
| IP0113 #02 Y:2018 | 02 | 2018 | Combine utility meters | $1,625 | - | |
| IP0113 #01 Y:2018 | 01 | 2018 | Lower temperature during the winter season and vice-versa | $2,753 | - |