12
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | Soap and other detergent manufacturing | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| MS0273 #12 Y:2005 | 12 | 2005 | Install timers and/or thermostats | $261 | $204 | |
| MS0273 #11 Y:2005 | 11 | 2005 | Air condition only space necessary | $891 | $240 | |
| MS0273 #10 Y:2005 | 10 | 2005 | Make a practice of turning off lights when not needed | $1,338 | $1,215 | |
| MS0273 #09 Y:2005 | 09 | 2005 | Use separate switches on perimeter lighting which may be turned off when natural light is available | $2,353 | $231 | |
| MS0273 #08 Y:2005 | 08 | 2005 | Eliminate leaks in inert gas and compressed air lines/ valves | $2,474 | $203 | |
| MS0273 #07 Y:2005 | 07 | 2005 | Pay utility bills on time | $3,704 | - | |
| MS0273 #06 Y:2005 | 06 | 2005 | Use adjustable frequency drive or multiple speed motors on existing system | $4,219 | $1,480 | |
| MS0273 #05 Y:2005 | 05 | 2005 | Utilize higher efficiency lamps and/or ballasts | $5,326 | $19,601 | |
| MS0273 #04 Y:2005 | 04 | 2005 | Recover waste heat from equipment | $5,737 | $685 | |
| MS0273 #03 Y:2005 | 03 | 2005 | Repair and eliminate steam leaks | $7,498 | $89 | |
| MS0273 #02 Y:2005 | 02 | 2005 | Utilize higher efficiency lamps and/or ballasts | $10,056 | $26,912 | |
| MS0273 #01 Y:2005 | 01 | 2005 | Use waste heat from hot flue gases to preheat | $16,069 | $12,540 |