Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,750

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Commercial printing (except screen and books)
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SD0691 #09 Y:2026 Install compressor air intakes in coolest locations $19,376 $4,825
SD0691 #08 Y:2026 Use heat pump for space conditioning $15,399 $29,800
SD0691 #07 Y:2026 Reduce the pressure of compressed air to the minimum required $1,161 -
SD0691 #06 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $64 $233
SD0691 #05 Y:2026 Use battery storage for demand control $242,570 $278,520
SD0691 #04 Y:2026 Use solar heat to make electricty $301,993 $404,796
SD0691 #03 Y:2026 Install direct acting units in place of compressed air pressure system in safety system $1,103 $5,179
SD0691 #02 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $8,959 $7,750
SD0691 #01 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $5,977 $5,475
MI0471 #07 Y:2025 Utilize higher efficiency lamps and/or ballasts $921 $1,747
MI0471 #06 Y:2025 Insulate bare equipment $212 $346
MI0471 #05 Y:2025 Close holes and openings in building such as broken windows $242 $389
MI0471 #04 Y:2025 Install vinyl strip / high speed / air curtain doors $11,709 $13,222
MI0471 #03 Y:2025 Optimize plant power factor $7,230 $7,058
MI0471 #02 Y:2025 Install occupancy sensors $1,132 $703
MI0471 #01 Y:2025 Change rate schedules or other changes in utility service $1,896 $104
WM0250 #10 Y:2025 Utilize energy-efficient belts and other improved mechanisms $544 $180
WM0250 #09 Y:2025 Recharge batteries on during off-peak demand periods $849 $1,650
WM0250 #08 Y:2025 Lower temperature during the winter season and vice-versa $1,178 -
WM0250 #07 Y:2025 Use compressor air filters $1,631 $5,051