45
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | Commercial printing (except screen and books) | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| BD0478 #08 Y:2016 | 08 | 2016 | Re-arrange equipment layout to reduce labor costs | $13,019 | $7,560 | |
| BD0478 #07 Y:2016 | 07 | 2016 | Install occupancy sensors | $751 | $450 | |
| BD0478 #06 Y:2016 | 06 | 2016 | Install compressor air intakes in coolest locations | $784 | $900 | |
| BD0478 #05 Y:2016 | 05 | 2016 | Utilize higher efficiency lamps and/or ballasts | $1,111 | $575 | |
| BD0478 #04 Y:2016 | 04 | 2016 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,217 | $1,000 | |
| BD0478 #03 Y:2016 | 03 | 2016 | Reduce the pressure of compressed air to the minimum required | $1,961 | $15 | |
| BD0478 #02 Y:2016 | 02 | 2016 | Lower temperature during the winter season and vice-versa | $2,345 | $15 | |
| BD0478 #01 Y:2016 | 01 | 2016 | Utilize higher efficiency lamps and/or ballasts | $4,978 | $3,229 | |
| BD0383 #06 Y:2010 | 06 | 2010 | Install occupancy sensors | $955 | $975 | |
| BD0383 #05 Y:2010 | 05 | 2010 | Install compressor air intakes in coolest locations | $1,087 | $1,500 | |
| BD0383 #04 Y:2010 | 04 | 2010 | Use most efficient type of electric motors | $2,708 | $1,620 | |
| BD0383 #03 Y:2010 | 03 | 2010 | Use radiant heater for spot heating | $8,456 | $4,240 | |
| BD0383 #02 Y:2010 | 02 | 2010 | Utilize higher efficiency lamps and/or ballasts | $21,355 | $7,633 | |
| BD0383 #01 Y:2010 | 01 | 2010 | Re-use or recycle hot or cold process exhaust air | $22,085 | $7,000 | |
| BD0329 #09 Y:2007 | 09 | 2007 | Minimize water usage | $977 | $2,000 | |
| BD0329 #08 Y:2007 | 08 | 2007 | Change operating conditions | $3,140 | - | |
| BD0329 #07 Y:2007 | 07 | 2007 | Utilize energy-efficient belts and other improved mechanisms | $3,306 | $2,200 | |
| BD0329 #06 Y:2007 | 06 | 2007 | Use most efficient type of electric motors | $4,834 | $3,600 | |
| BD0329 #05 Y:2007 | 05 | 2007 | Utilize higher efficiency lamps and/or ballasts | $237 | $225 | |
| BD0329 #04 Y:2007 | 04 | 2007 | Install occupancy sensors | $3,724 | $225 |