10
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | Folding paperboard box manufacturing | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| UD0787 #10 Y:2008 | 10 | 2008 | Install compressor air intakes in coolest locations | $388 | $1,000 | |
| UD0787 #09 Y:2008 | 09 | 2008 | Eliminate leaks in inert gas and compressed air lines/ valves | $2,351 | $1,000 | |
| UD0787 #08 Y:2008 | 08 | 2008 | Reduce the pressure of compressed air to the minimum required | $1,656 | - | |
| UD0787 #07 Y:2008 | 07 | 2008 | Utilize higher efficiency lamps and/or ballasts | $1,714 | $2,828 | |
| UD0787 #06 Y:2008 | 06 | 2008 | Meter recycled water (to reduce sewer charges) | $2,330 | $300 | |
| UD0787 #05 Y:2008 | 05 | 2008 | Optimize plant power factor | $7,098 | $39,000 | |
| UD0787 #04 Y:2008 | 04 | 2008 | Install / repair insulation on steam lines | $9,025 | $2,424 | |
| UD0787 #03 Y:2008 | 03 | 2008 | Eliminate or reduce compressed air usage | $12,341 | $6,560 | |
| UD0787 #02 Y:2008 | 02 | 2008 | Utilize higher efficiency lamps and/or ballasts | $35,242 | $107,122 | |
| UD0787 #01 Y:2008 | 01 | 2008 | Reduce ventilation air | $47,843 | $62,700 |