Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

583

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Textile product mills
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
GT1007 #12 Y:2026 Optimize plant power factor $859 $4,814
GT1007 #11 Y:2026 Burn fossil fuel to produce steam to drive a steam turbine-generator and use steam exhaust for heat $95,454 $517,500
GT1007 #10 Y:2026 Turn off equipment during breaks, reduce operating time $49 $242
GT1007 #09 Y:2026 Utilize higher efficiency lamps and/or ballasts $1,648 $7,708
GT1007 #08 Y:2026 Use solar heat to make electricty $97,140 $373,452
GT1007 #07 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $6,064 $19,750
GT1007 #06 Y:2026 Utilize energy-efficient belts and other improved mechanisms $646 $1,561
GT1007 #05 Y:2026 Eliminate or reduce compressed air usage $737 $600
GT1007 #04 Y:2026 Conserve energy by efficient use of vending machines $278 $90
GT1007 #03 Y:2026 Reduce the pressure of compressed air to the minimum required $1,732 $400
GT1007 #02 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $10,431 $1,850
GT1007 #01 Y:2026 Apply for tax-free status for energy purchases $14,393 $400
MU0084 #07 Y:2026 Pay bills on time to avoid late fees $16,942 -
MU0084 #06 Y:2026 Keep doors and windows shut when not on use $67 -
MU0084 #05 Y:2026 Utilize higher efficiency lamps and/or ballasts $205 $987
MU0084 #04 Y:2026 Utilize higher efficiency lamps and/or ballasts $3,615 $3,336
MU0084 #03 Y:2026 Install occupancy sensors $206 $1,222
MU0084 #02 Y:2026 Recover heat from exhausted steam, hot air or hot water $9,084 $9,725
MU0084 #01 Y:2026 Optimize plant power factor $74,251 $77,040
UU0270 #06 Y:2025 Purchase gas directly from a contract gas supplier $17,175 $12,320