13
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | Narrow fabric mills and schiffli machine embroidery | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| MA0547 #13 Y:2003 | 13 | 2003 | Recover waste heat from equipment | $349 | $1,400 | |
| MA0547 #12 Y:2003 | 12 | 2003 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,376 | $825 | |
| MA0547 #11 Y:2003 | 11 | 2003 | Add area lighting switches | $1,964 | $2,400 | |
| MA0547 #10 Y:2003 | 10 | 2003 | Replace electrically-operated equipment with fossil fuel equipment | $2,829 | $7,475 | |
| MA0547 #09 Y:2003 | 09 | 2003 | Use adjustable frequency drive or multiple speed motors on existing system | $3,321 | $10,950 | |
| MA0547 #08 Y:2003 | 08 | 2003 | Reduce the pressure of compressed air to the minimum required | $7,117 | $6,600 | |
| MA0547 #07 Y:2003 | 07 | 2003 | Use minimum steam operating pressure | $13,419 | - | |
| MA0547 #06 Y:2003 | 06 | 2003 | Install timers and/or thermostats | $14,705 | $4,020 | |
| MA0547 #05 Y:2003 | 05 | 2003 | Use hot process fluids to preheat incoming process fluids | $14,711 | $44,000 | |
| MA0547 #04 Y:2003 | 04 | 2003 | Use adjustable frequency drive or multiple speed motors on existing system | $34,463 | $78,000 | |
| MA0547 #03 Y:2003 | 03 | 2003 | Install / repair insulation on steam lines | $43,010 | $24,670 | |
| MA0547 #02 Y:2003 | 02 | 2003 | Use existing dam to generate electricity | $50,195 | $210,000 | |
| MA0547 #01 Y:2003 | 01 | 2003 | Clear and rent existing space | $200,000 | $398,000 |