Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

101

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Tortilla manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
NL0117 #06 Y:2025 Utilize energy-efficient belts and other improved mechanisms $112 $260
NL0117 #05 Y:2025 Utilize higher efficiency lamps and/or ballasts $293 $70
NL0117 #04 Y:2025 Apply for tax-free status for energy purchases $366 $120
NL0117 #03 Y:2025 Use or replace with energy efficient substitutes $523 $1,530
NL0117 #02 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $2,209 $600
NL0117 #01 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $6,626 $11,440
MI0440 #09 Y:2024 Install vinyl strip / high speed / air curtain doors $2,423 $279
MI0440 #08 Y:2024 Upgrade controls on compressors $8,533 $42,540
MI0440 #07 Y:2024 Eliminate or reduce compressed air usage $10,491 $1,720
MI0440 #06 Y:2024 Apply for investment incentives $74,097 -
MI0440 #05 Y:2024 Air condition only space necessary $18,769 $74,097
MI0440 #04 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $18,986 $1,980
MI0440 #03 Y:2024 Eliminate or reduce compressed air usage $19,242 $860
MI0440 #02 Y:2024 Lower temperature during the winter season and vice-versa $21,169 $1,320
MI0440 #01 Y:2024 Use solar heat to make electricty $211,950 $698,434
SJ0013 #09 Y:2023 Combine utility meters $454 -
SJ0013 #08 Y:2023 Insulate bare equipment $1,399 $1,473
SJ0013 #07 Y:2023 Utilize energy-efficient belts and other improved mechanisms $155 $22
SJ0013 #06 Y:2023 Turn off equipment during breaks, reduce operating time $20,579 -
SJ0013 #05 Y:2023 Eliminate or reduce compressed air usage $733 -