13
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | Frozen fruit, juice, and vegetable manufacturing | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| WV0296 #13 Y:2004 | 13 | 2004 | Utilize energy-efficient belts and other improved mechanisms | $319 | $528 | |
| WV0296 #12 Y:2004 | 12 | 2004 | Eliminate leaks in inert gas and compressed air lines/ valves | $377 | $66 | |
| WV0296 #11 Y:2004 | 11 | 2004 | Install compressor air intakes in coolest locations | $389 | $267 | |
| WV0296 #10 Y:2004 | 10 | 2004 | Develop a repair/replace policy | $1,034 | $230 | |
| WV0296 #09 Y:2004 | 09 | 2004 | Utilize higher efficiency lamps and/or ballasts | $1,069 | $9,782 | |
| WV0296 #08 Y:2004 | 08 | 2004 | Reduce the pressure of compressed air to the minimum required | $1,289 | $845 | |
| WV0296 #07 Y:2004 | 07 | 2004 | Repair or replace steam traps | $1,549 | $1,000 | |
| WV0296 #06 Y:2004 | 06 | 2004 | Insulate bare equipment | $2,989 | $1,302 | |
| WV0296 #05 Y:2004 | 05 | 2004 | Repair and eliminate steam leaks | $4,658 | $200 | |
| WV0296 #04 Y:2004 | 04 | 2004 | Analyze flue gas for proper air/fuel ratio | $8,948 | $1,000 | |
| WV0296 #03 Y:2004 | 03 | 2004 | Use waste heat from hot flue gases to preheat | $9,181 | $3,426 | |
| WV0296 #02 Y:2004 | 02 | 2004 | Recover heat from exhausted steam, hot air or hot water | $15,329 | $10,875 | |
| WV0296 #01 Y:2004 | 01 | 2004 | Burn a less expensive grade of fuel | $70,180 | $130 |