11
matching recommendations
$
$
ARC | 2+ Digits Required | |
NAICS | Industrial building construction | |
SIC | 2+ Digits Required | |
3+ Characters Required for Products |
ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
---|---|---|---|---|---|---|
MZ0105 #11 Y:2012 | 11 | 2012 | Train operators for maximum operating efficiency | $1 | $1 | |
MZ0105 #10 Y:2012 | 10 | 2012 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,476 | $1,140 | |
MZ0105 #09 Y:2012 | 09 | 2012 | Replace city water with recycled water via cooling tower | $2,288 | $2,000 | |
MZ0105 #08 Y:2012 | 08 | 2012 | Use adjustable frequency drive or multiple speed motors on existing system | $30,462 | $115,696 | |
MZ0105 #07 Y:2012 | 07 | 2012 | Install compressor air intakes in coolest locations | $920 | $1,160 | |
MZ0105 #06 Y:2012 | 06 | 2012 | Use outside cold water source as a supply of cooling water | $42,514 | $318,000 | |
MZ0105 #05 Y:2012 | 05 | 2012 | Install occupancy sensors | $58,099 | $39,870 | |
MZ0105 #04 Y:2012 | 04 | 2012 | Maintain air filters by cleaning or replacement | $8,215 | $52,200 | |
MZ0105 #03 Y:2012 | 03 | 2012 | Preheat combustion air with waste heat | $12,339 | $13,500 | |
MZ0105 #02 Y:2012 | 02 | 2012 | Modify refrigeration system to operate at a lower pressure | $42,257 | $4,645 | |
MZ0105 #01 Y:2012 | 01 | 2012 | Utilize higher efficiency lamps and/or ballasts | $12,823 | $28,300 |