Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

18

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Nonresidential building construction
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UU0210 #07 Y:2022 Shade windows from summer sun $56 $240
UU0210 #06 Y:2022 Use computer programs to optimize hvac performance $1,582 $2,500
UU0210 #05 Y:2022 Install occupancy sensors $2,831 $5,286
UU0210 #04 Y:2022 Optimize plant power factor $3,114 $6,718
UU0210 #03 Y:2022 Utilize higher efficiency lamps and/or ballasts $3,954 $9,928
UU0210 #02 Y:2022 Air condition only space necessary $8,161 $100
UU0210 #01 Y:2022 Use computer programs to optimize hvac performance $12,345 $2,500
MZ0105 #11 Y:2012 Train operators for maximum operating efficiency $1 $1
MZ0105 #10 Y:2012 Eliminate leaks in inert gas and compressed air lines/ valves $1,476 $1,140
MZ0105 #09 Y:2012 Replace city water with recycled water via cooling tower $2,288 $2,000
MZ0105 #08 Y:2012 Use adjustable frequency drive or multiple speed motors on existing system $30,462 $115,696
MZ0105 #07 Y:2012 Install compressor air intakes in coolest locations $920 $1,160
MZ0105 #06 Y:2012 Use outside cold water source as a supply of cooling water $42,514 $318,000
MZ0105 #05 Y:2012 Install occupancy sensors $58,099 $39,870
MZ0105 #04 Y:2012 Maintain air filters by cleaning or replacement $8,215 $52,200
MZ0105 #03 Y:2012 Preheat combustion air with waste heat $12,339 $13,500
MZ0105 #02 Y:2012 Modify refrigeration system to operate at a lower pressure $42,257 $4,645
MZ0105 #01 Y:2012 Utilize higher efficiency lamps and/or ballasts $12,823 $28,300