21
matching recommendations
$
$
ARC | 2+ Digits Required | |
NAICS | Crushed and broken limestone mining and quarrying | |
SIC | 2+ Digits Required | |
3+ Characters Required for Products |
ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
---|---|---|---|---|---|---|
NT0050 #05 Y:2025 | 05 | 2025 | Use properly designed and sized hvac equipment | $2,692 | $7,518 |
n/a
|
NT0050 #04 Y:2025 | 04 | 2025 | Purchase equipment instead of leasing | $13,978 | $7,020 |
n/a
|
NT0050 #03 Y:2025 | 03 | 2025 | Utilize higher efficiency lamps and/or ballasts | $26,369 | $56,820 |
n/a
|
NT0050 #02 Y:2025 | 02 | 2025 | Use or replace with energy efficient substitutes | $118,800 | $170,000 |
n/a
|
NT0050 #01 Y:2025 | 01 | 2025 | Purchase equipment instead of leasing | $359,441 | $504,900 |
n/a
|
TT0042 #03 Y:2009 | 03 | 2009 | Utilize higher efficiency lamps and/or ballasts | $4,430 | $20,000 | |
TT0042 #02 Y:2009 | 02 | 2009 | Recover waste heat from equipment | $16,800 | $2,900 | |
TT0042 #01 Y:2009 | 01 | 2009 | Use waste heat from hot flue gases to preheat | $38,600 | $28,400 | |
IC0133 #04 Y:2007 | 04 | 2007 | Change rate schedules or other changes in utility service | $20,000 | - | |
IC0133 #03 Y:2007 | 03 | 2007 | Use most efficient type of electric motors | $7,116 | $22,551 | |
IC0133 #02 Y:2007 | 02 | 2007 | Establish equipment maintenance schedule | $22,188 | - | |
IC0133 #01 Y:2007 | 01 | 2007 | Replace existing equipment with more suitable substitutes | $181,608 | $3,876 | |
SD0384 #06 Y:2006 | 06 | 2006 | Utilize higher efficiency lamps and/or ballasts | $1,242 | $5,792 | |
SD0384 #05 Y:2006 | 05 | 2006 | Reduce the pressure of compressed air to the minimum required | $2,401 | - | |
SD0384 #04 Y:2006 | 04 | 2006 | Use adjustable frequency drive or multiple speed motors on existing system | $20,082 | $13,481 | |
SD0384 #03 Y:2006 | 03 | 2006 | Use adjustable frequency drive or multiple speed motors on existing system | $115,354 | $45,825 | |
SD0384 #02 Y:2006 | 02 | 2006 | Use adjustable frequency drive or multiple speed motors on existing system | $184,174 | $85,865 | |
SD0384 #01 Y:2006 | 01 | 2006 | Use adjustable frequency drive or multiple speed motors on existing system | $199,400 | $80,665 | |
BD0312 #03 Y:2006 | 03 | 2006 | Reduce the pressure of compressed air to the minimum required | $16,668 | - | |
BD0312 #02 Y:2006 | 02 | 2006 | Use synthetic lubricant | $16,661 | $10,500 |