Assessment Year | 2006 |
---|---|
Principal Product | limestone |
NAICS | 212312: Crushed and Broken Limestone Mining and Quarrying |
SIC | 1422: Crushed and Broken Limestone |
Sales Range | $10 M to 50M |
# of Employees | 130 |
Plant Area |
2,400,000
ft2
|
Annual Production | 1,404,000
ton
|
Production Hrs. Annual | 8,736
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $2,294,047 | 34,543,672 |
kWh
|
$0.066 |
Electricity Demand | $436,915 | 55,943 |
kW-mo/yr
|
$7.81 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $522,653 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
---|---|---|---|---|---|---|
01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $199,400 | $80,665 |
$171,738
2,586,423
kWh
|
$27,662
-
kW-mo/yr
|
|
02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $184,174 | $85,865 |
$158,614
2,388,734
kWh
|
$25,560
-
kW-mo/yr
|
|
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $115,354 | $45,825 |
$99,345
1,496,149
kWh
|
$16,009
-
kW-mo/yr
|
|
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $20,082 | $13,481 |
$20,082
302,443
kWh
|
- | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,401 | - |
$2,401
36,146
kWh
|
- | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,242 | $5,792 |
$1,072
16,144
kWh
|
$170
-
kW-mo/yr
|
|
TOTAL RECOMMENDED | $522,653 | $231,628 |
$453,252
6,826,039
kWh
|
$69,401
-
kW-mo/yr
|
||
TOTAL IMPLEMENTED | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs