12
matching recommendations
$
$
ARC | 2+ Digits Required | |
NAICS | Cattle feedlots | |
SIC | 2+ Digits Required | |
3+ Characters Required for Products |
ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
---|---|---|---|---|---|---|
SF0411 #12 Y:2012 | 12 | 2012 | Utilize higher efficiency lamps and/or ballasts | $33,986 | $135,330 | |
SF0411 #11 Y:2012 | 11 | 2012 | Replace existing chiller with high efficiency model | $1,227 | $3,774 | |
SF0411 #10 Y:2012 | 10 | 2012 | Install occupancy sensors | $18,497 | $47,901 | |
SF0411 #09 Y:2012 | 09 | 2012 | Use waste heat from hot flue gases to preheat | $4,671 | $11,216 | |
SF0411 #08 Y:2012 | 08 | 2012 | Recover waste heat from equipment | $2,723 | $3,965 | |
SF0411 #07 Y:2012 | 07 | 2012 | Use multiple-effect evaporators | $14,245 | $17,433 | |
SF0411 #06 Y:2012 | 06 | 2012 | Use or replace with energy efficient substitutes | $1,094 | $939 | |
SF0411 #05 Y:2012 | 05 | 2012 | Use adjustable frequency drive or multiple speed motors on existing system | $19,104 | $6,660 | |
SF0411 #04 Y:2012 | 04 | 2012 | Analyze flue gas for proper air/fuel ratio | $1,666 | $1,200 | |
SF0411 #03 Y:2012 | 03 | 2012 | Schedule use of elevators to conserve energy | $716 | - | |
SF0411 #02 Y:2012 | 02 | 2012 | Eliminate leaks in inert gas and compressed air lines/ valves | $3,097 | $504 | |
SF0411 #01 Y:2012 | 01 | 2012 | Combine utility meters | $35,266 | - |