The Assessment Recommendation Codes ARC is the ITAC system for classifying recommendation types.
ARC | 2+ Digits Required | |
NAICS | 3+ Digits Required | |
SIC | 2+ Digits Required | |
3+ Characters Required for Products |
See the Assessment Recommendation Codes ARC Manual for additional details.
TOP
|
ARC | Description | Recommendations Rec's | Recommended Rec'd $ Savings | Average Avg Payback PB | Implementation Imp Rate |
---|---|---|---|---|---|---|
back
|
3.xxxx | 3.xxxx: WASTE MINIMIZATION / POLLUTION PREVENTION | 11k10,608 | $31k$30,605 avg | 1.6 yrs | 40.1% |
back
|
3.7xxx | 3.7xxx: Maintenance | 640640 | $16k$16,026 avg | 0.7 yrs | 47.3% |
back
|
3.72xx | 3.72xx: Spillage | 124124 | $34k$34,126 avg | 0.7 yrs | 49.1% |
selected | 3.722x | 3.722x: Hardware | 2525 | $34k$34,311 avg | 1.1 yrs | 47.6% |
3.7221 | 3.7221: IMPROVE PROCESS CONTROL TO PREVENT SPILLS OF MATERIAL | 1313 | $53k$53,245 avg | 0.3 yrs | 60.0% | |
3.7222 | 3.7222: MINIMIZE OVERFLOWS BY INSTALLING LEVEL CONTROLS | 44 | $13k$12,701 avg | 1.1 yrs | 33.3% | |
3.7223 | 3.7223: INSTALL SHROUDING ON MACHINES TO PREVENT SPLASHING | 66 | $5.0k$4,964 avg | 2.2 yrs | 16.7% | |
3.7224 | 3.7224: USE PUMPS AND PIPING TO DECREASE THE FREQUENCY OF SPILLAGE DURING MATERIAL TRANSFER | 22 | $42k$42,496 avg | 3.2 yrs | 100.0% |