ITAC Assessment: WV0658
ITAC logo
ITAC Assessment: WV0658
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Food Grade Plastic Containers
NAICS 326111: Plastics Bag and Pouch Manufacturing
SIC 2673: Plastics, Foil, and Coated Paper Bags
Sales Range $50
M
to 100
M
# of Employees 200
Plant Area 172,000
ft2
Annual Production 50,000,000
lb
Production Hrs. Annual 8,400
hrs
Location (State) West Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,121,476 24,134,014
kWh
Electricity Demand $802,649 43,064
kW-mo/yr
Electricity Fees $5,274 -
Natural Gas $115,312 46,295
MMBtu
TOTAL YEARLY COSTS $2,044,711
RECOMMENDED SAVINGS* $118,666 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $95,758

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings
01 2.4157: Establish a predictive maintenance program $46,042 $4,000 $34,139
734,166
kWh
$19,553
-
kW-mo/yr
- $(-7,650.0) -
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $20,234 $90,000 $12,853
276,411
kWh
$7,381
-
kW-mo/yr
- - -
03 2.2511: Insulate bare equipment $12,543 $934 $7,976
171,537
kWh
$4,567
-
kW-mo/yr
- - -
04 2.4157: Establish a predictive maintenance program $12,305 $1,500 $12,765
274,525
kWh
$7,307
-
kW-mo/yr
- $(-7,767.0) -
05 2.4151: Develop a repair/replace policy $10,700 $3,650 $7,181
154,420
kWh
$4,119
-
kW-mo/yr
- - $(-600.0)
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $7,787 $900 $4,954
106,529
kWh
$2,833
-
kW-mo/yr
- - -
07 2.4111: Utilize energy-efficient belts and other improved mechanisms $5,056 $7,004 $3,211
69,044
kWh
$1,845
-
kW-mo/yr
- - -
08 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,674 $10,167 $1,108
23,834
kWh
$1,566
-
kW-mo/yr
- - -
09 2.1233: Analyze flue gas for proper air/fuel ratio $1,325 $952 - - $1,325
-
MMBtu
- -
TOTAL RECOMMENDED $118,666 $119,107 $84,187
1,810,466
kWh
$49,171
-
kW-mo/yr
$1,325
-
MMBtu
$(-15,417.0) $(-600.0)
TOTAL IMPLEMENTED $95,758 $18,940 $70,226
1,510,221
kWh
$40,224
-
kW-mo/yr
$1,325
-
MMBtu
$(-15,417.0) $(-600.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs