Assessment Year | 2018 |
---|---|
Principal Product | Snow removal equipment |
NAICS | 332999: All Other Miscellaneous Fabricated Metal Product Manufacturing |
SIC | 3499: Fabricated Metal Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 100 |
Plant Area |
250,000
ft2
|
Annual Production | 169
thousand feet
|
Production Hrs. Annual | 3,120
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $367,559 | 3,280,758 |
kWh
|
$0.11 | |
Electricity Demand | $73,243 | 10,800 |
kW-mo/yr
|
$6.78 | |
Electricity Fees | $13,587 | - |
|
- | |
Natural Gas | $85,834 | 15,575 |
MMBtu
|
$5.51 | |
Waste Disposal Costs | |||||
Water Usage | $20,296 | 2,567 |
Tgal
|
$7.91 | |
Water Disposal | $35,086 | 2,567 |
Tgal
|
$13.67 | |
TOTAL YEARLY COSTS | $595,605 | ||||
RECOMMENDED SAVINGS* | $183,729 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $84,119 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Usage Savings | Water Disposal Savings | Personnel Changes Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|---|---|---|
01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $81,443 | $80,480 |
$81,443
703,913
kWh
|
- | - | - | - | - | - | |
02 | 2.7135: Install occupancy sensors | $77,310 | $17,740 |
$63,115
545,504
kWh
|
$14,195
-
kW-mo/yr
|
- | - | - | - | - | |
03 | 2.4322: Use or replace with energy efficient substitutes | $17,434 | $68,000 |
$14,227
122,968
kWh
|
$3,207
-
kW-mo/yr
|
- | - | - | - | - | |
04 | 2.4151: Develop a repair/replace policy | $2,854 | $533 |
$2,392
20,672
kWh
|
$542
-
kW-mo/yr
|
- | - | - | $(-80.0) | - | |
05 | 2.3191: Use demand controller or load shedder | $2,441 | $500 | - |
$2,441
-
kW-mo/yr
|
- | - | - | - | - | |
06 | 2.2511: Insulate bare equipment | $810 | $1,600 | - | - |
$810
-
MMBtu
|
- | - | - | - | |
07 | 3.3131: Use evaporation to concentrate material | $733 | $1,750 | - | - | - |
$296
-
Tgal
|
$512
-
Tgal
|
- | $(-75.0) | |
08 | 2.4239: Eliminate or reduce compressed air usage | $704 | $40 |
$575
4,970
kWh
|
$129
-
kW-mo/yr
|
- | - | - | - | - | |
TOTAL RECOMMENDED | $183,729 | $170,643 |
$161,752
1,398,027
kWh
|
$20,514
-
kW-mo/yr
|
$810
-
MMBtu
|
$296
-
Tgal
|
$512
-
Tgal
|
$(-80.0) | $(-75.0) | ||
TOTAL IMPLEMENTED | $84,119 | $20,413 |
$66,082
571,146
kWh
|
$17,307
-
kW-mo/yr
|
$810
-
MMBtu
|
- | - | $(-80.0) | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Usage Savings | Water Disposal Savings | Personnel Changes Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs