ITAC Assessment: WV0565
ITAC logo
ITAC Assessment: WV0565
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Snow removal equipment
NAICS 332999: All Other Miscellaneous Fabricated Metal Product Manufacturing
SIC 3499: Fabricated Metal Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 250,000
ft2
Annual Production 169
thousand feet
Production Hrs. Annual 3,120
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $367,559 3,280,758
kWh
Electricity Demand $73,243 10,800
kW-mo/yr
Electricity Fees $13,587 -
Natural Gas $85,834 15,575
MMBtu
Waste Disposal Costs
Water Usage $20,296 2,567
Tgal
Water Disposal $35,086 2,567
Tgal
TOTAL YEARLY COSTS $595,605
RECOMMENDED SAVINGS* $183,729 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $84,119

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings Water Disposal Savings Personnel Changes Savings Administrative Changes Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $81,443 $80,480 $81,443
703,913
kWh
- - - - - -
02 2.7135: Install occupancy sensors $77,310 $17,740 $63,115
545,504
kWh
$14,195
-
kW-mo/yr
- - - - -
03 2.4322: Use or replace with energy efficient substitutes $17,434 $68,000 $14,227
122,968
kWh
$3,207
-
kW-mo/yr
- - - - -
04 2.4151: Develop a repair/replace policy $2,854 $533 $2,392
20,672
kWh
$542
-
kW-mo/yr
- - - $(-80.0) -
05 2.3191: Use demand controller or load shedder $2,441 $500 - $2,441
-
kW-mo/yr
- - - - -
06 2.2511: Insulate bare equipment $810 $1,600 - - $810
-
MMBtu
- - - -
07 3.3131: Use evaporation to concentrate material $733 $1,750 - - - $296
-
Tgal
$512
-
Tgal
- $(-75.0)
08 2.4239: Eliminate or reduce compressed air usage $704 $40 $575
4,970
kWh
$129
-
kW-mo/yr
- - - - -
TOTAL RECOMMENDED $183,729 $170,643 $161,752
1,398,027
kWh
$20,514
-
kW-mo/yr
$810
-
MMBtu
$296
-
Tgal
$512
-
Tgal
$(-80.0) $(-75.0)
TOTAL IMPLEMENTED $84,119 $20,413 $66,082
571,146
kWh
$17,307
-
kW-mo/yr
$810
-
MMBtu
- - $(-80.0) -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings Water Disposal Savings Personnel Changes Savings Administrative Changes Savings