Assessment Year | 2015 |
---|---|
Principal Product | automotive heat shields |
NAICS | 336390: Other Motor Vehicle Parts Manufacturing |
SIC | 3714: Motor Vehicle Parts and Accessories |
Sales Range | $10 M to 50M |
# of Employees | 70 |
Plant Area |
43,000
ft2
|
Annual Production | 3,000,000
pieces
|
Production Hrs. Annual | 6,120
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $163,566 | 1,633,280 |
kWh
|
$0.10 |
Electricity Demand | $26,435 | 3,834 |
kW-mo/yr
|
$6.89 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $27,205 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $22,165 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $12,981 | $10,019 |
$11,435
114,240
kWh
|
$1,546
-
kW-mo/yr
|
- | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,178 | $4,647 |
$2,798
27,956
kWh
|
$380
-
kW-mo/yr
|
- | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $3,013 | $20 |
$2,653
26,507
kWh
|
$360
-
kW-mo/yr
|
- | |
04 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $2,650 | - | - |
$2,650
-
kW-mo/yr
|
- | |
05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $2,477 | - |
$2,180
21,780
kWh
|
$297
-
kW-mo/yr
|
- | |
06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $2,390 | $11,630 |
$2,107
21,048
kWh
|
$283
-
kW-mo/yr
|
- | |
07 | 2.4151: Develop a repair/replace policy | $516 | $542 |
$1,091
10,895
kWh
|
$145
-
kW-mo/yr
|
$(-720.0) | |
TOTAL RECOMMENDED | $27,205 | $26,858 |
$22,264
222,426
kWh
|
$5,661
-
kW-mo/yr
|
$(-720.0) | ||
TOTAL IMPLEMENTED | $22,165 | $15,228 |
$20,157
201,378
kWh
|
$2,728
-
kW-mo/yr
|
$(-720.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs