ITAC Assessment: WV0500
ITAC logo
ITAC Assessment: WV0500
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product automotive heat shields
NAICS 336390: Other Motor Vehicle Parts Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $10
M
to 50
M
# of Employees 70
Plant Area 43,000
ft2
Annual Production 3,000,000
pieces
Production Hrs. Annual 6,120
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $163,566 1,633,280
kWh
Electricity Demand $26,435 3,834
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $27,205 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $22,165

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $12,981 $10,019 $11,435
114,240
kWh
$1,546
-
kW-mo/yr
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $3,178 $4,647 $2,798
27,956
kWh
$380
-
kW-mo/yr
-
03 2.4231: Reduce the pressure of compressed air to the minimum required $3,013 $20 $2,653
26,507
kWh
$360
-
kW-mo/yr
-
04 2.3131: Reschedule plant operations or reduce load to avoid peaks $2,650 - - $2,650
-
kW-mo/yr
-
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,477 - $2,180
21,780
kWh
$297
-
kW-mo/yr
-
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,390 $11,630 $2,107
21,048
kWh
$283
-
kW-mo/yr
-
07 2.4151: Develop a repair/replace policy $516 $542 $1,091
10,895
kWh
$145
-
kW-mo/yr
$(-720.0)
TOTAL RECOMMENDED $27,205 $26,858 $22,264
222,426
kWh
$5,661
-
kW-mo/yr
$(-720.0)
TOTAL IMPLEMENTED $22,165 $15,228 $20,157
201,378
kWh
$2,728
-
kW-mo/yr
$(-720.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs