ITAC Assessment: WV0419
ITAC logo
ITAC Assessment: WV0419
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product Transformers
NAICS 335311: Power, Distribution, and Specialty Transformer Manufacturing
SIC 3612: Power, Distribution, and Specialty Transformers
Sales Range $50
M
to 100
M
# of Employees 311
Plant Area 700,000
ft2
Annual Production 130
pieces
Production Hrs. Annual 3,744
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $554,848 13,471,554
kWh
Electricity Demand $177,315 33,497
kW-mo/yr
Electricity Fees $1,838 -
Natural Gas $737,772 73,846
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $174,881 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $67,036

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Increase in Production Savings
01 4.111: Add equipment/ operators to reduce production bottleneck $80,000 $53,870 - - - $80,000
02 2.7142: Utilize higher efficiency lamps and/or ballasts $66,262 $161,162 $48,847
1,185,599
kWh
$17,415
-
kW-mo/yr
- -
03 2.7243: Improve air circulation with destratification fans / other methods $27,845 $59,247 $(-1,208.0)
(-29,327)
kWh
$(-497.0)
-
kW-mo/yr
$29,550
-
MMBtu
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $774 $528 $658
15,978
kWh
$116
-
kW-mo/yr
- -
TOTAL RECOMMENDED $174,881 $274,807 $48,297
1,172,250
kWh
$17,034
-
kW-mo/yr
$29,550
-
MMBtu
$80,000
TOTAL IMPLEMENTED $67,036 $161,690 $49,505
1,201,577
kWh
$17,531
-
kW-mo/yr
- -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs