Assessment Year | 2010 |
---|---|
Principal Product | Transformers |
NAICS | 335311: Power, Distribution, and Specialty Transformer Manufacturing |
SIC | 3612: Power, Distribution, and Specialty Transformers |
Sales Range | $50 M to 100M |
# of Employees | 311 |
Plant Area |
700,000
ft2
|
Annual Production | 130
pieces
|
Production Hrs. Annual | 3,744
hrs
|
Location (State) | Pennsylvania |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $554,848 | 13,471,554 |
kWh
|
$0.041 |
Electricity Demand | $177,315 | 33,497 |
kW-mo/yr
|
$5.29 |
Electricity Fees | $1,838 | - |
|
- |
Natural Gas | $737,772 | 73,846 |
MMBtu
|
$9.99 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $174,881 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $67,036 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Increase in Production Savings |
---|---|---|---|---|---|---|---|---|
01 | 4.111: Add equipment/ operators to reduce production bottleneck | $80,000 | $53,870 | - | - | - | $80,000 | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $66,262 | $161,162 |
$48,847
1,185,599
kWh
|
$17,415
-
kW-mo/yr
|
- | - | |
03 | 2.7243: Improve air circulation with destratification fans / other methods | $27,845 | $59,247 |
$(-1,208.0)
(-29,327)
kWh
|
$(-497.0)
-
kW-mo/yr
|
$29,550
-
MMBtu
|
- | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $774 | $528 |
$658
15,978
kWh
|
$116
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $174,881 | $274,807 |
$48,297
1,172,250
kWh
|
$17,034
-
kW-mo/yr
|
$29,550
-
MMBtu
|
$80,000 | ||
TOTAL IMPLEMENTED | $67,036 | $161,690 |
$49,505
1,201,577
kWh
|
$17,531
-
kW-mo/yr
|
- | - |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs