ITAC Assessment: WV0402
ITAC logo
ITAC Assessment: WV0402
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product Printed Materials
NAICS 323117: Books Printing
SIC 2732: Book Printing
Sales Range $50
M
to 100
M
# of Employees 170
Plant Area 370,000
ft2
Annual Production 45,000,000
units
Production Hrs. Annual 7,800
hrs
Location (State) West Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $364,498 13,315,200
kWh
Electricity Demand $316,110 24,261
kW-mo/yr
Natural Gas $427,045 28,486
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $157,129 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $35,224

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
01 2.2492: Use "heat wheel" or other heat exchanger to cross-exchange building exhaust air with make-up air $63,671 $114,000 $(-2,048.0)
(-76,372)
kWh
$(-1,509.0)
-
kW-mo/yr
$70,228
-
MMBtu
$(-3,000.0)
02 2.2414: Use waste heat from hot flue gases to preheat $32,843 $25,000 - - $32,843
-
MMBtu
-
03 2.1233: Analyze flue gas for proper air/fuel ratio $16,488 - - - $17,658
-
MMBtu
$(-1,170.0)
04 2.7142: Utilize higher efficiency lamps and/or ballasts $15,346 $9,200 $8,819
328,948
kWh
$6,527
-
kW-mo/yr
- -
05 2.2437: Recover waste heat from equipment $13,296 $2,000 - - $13,296
-
MMBtu
-
06 2.7241: Install outside air damper / economizer on hvac unit $12,095 $4,000 $6,948
259,164
kWh
$5,147
-
kW-mo/yr
- -
07 2.4111: Utilize energy-efficient belts and other improved mechanisms $3,390 - $1,945
72,564
kWh
$1,445
-
kW-mo/yr
- -
TOTAL RECOMMENDED $157,129 $154,200 $15,664
584,304
kWh
$11,610
-
kW-mo/yr
$134,025
-
MMBtu
$(-4,170.0)
TOTAL IMPLEMENTED $35,224 $9,200 $10,764
401,512
kWh
$7,972
-
kW-mo/yr
$17,658
-
MMBtu
$(-1,170.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs