ITAC Assessment: WV0397
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2009
Principal Product Pharmaceutical Pills
NAICS 325412: Pharmaceutical Preparation Manufacturing
SIC 2834: Pharmaceutical Preparations
Sales Range $100
M
to 500
M
# of Employees 2,100
Plant Area 1,459,343
ft2
Annual Production 50,000,000
units
Production Hrs. Annual 6,240
hrs
Location (State) West Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,289,601 47,280,339
kWh
Electricity Demand $620,337 86,041
kW-mo/yr
Electricity Fees $37,635 -
Natural Gas $1,514,630 165,952
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $493,360 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $47,366

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings
01 2.7314: Reduce ventilation air $153,645 $145,000 $12,472
457,193
kWh
$4,492
-
kW-mo/yr
$136,681
-
MMBtu
- -
02 2.7111: Reduce illumination to minimum necessary levels $81,057 $131,239 $55,000
2,016,116
kWh
$26,057
-
kW-mo/yr
- - -
03 2.7221: Lower temperature during the winter season and vice-versa $77,885 $17,000 $13,580
497,815
kWh
- $64,305
-
MMBtu
- -
04 2.1212: Operate boilers on high fire setting $56,916 $80,000 - - $56,916
-
MMBtu
- -
05 2.3212: Optimize plant power factor $40,984 $44,000 - - - - $40,984
06 2.2414: Use waste heat from hot flue gases to preheat $26,130 $36,900 - - $26,130
-
MMBtu
- -
07 2.4111: Utilize energy-efficient belts and other improved mechanisms $17,728 - $12,121
444,330
kWh
$5,607
-
kW-mo/yr
- - -
08 2.1233: Analyze flue gas for proper air/fuel ratio $15,726 $1,000 - - $16,251
-
MMBtu
$(-525.0) -
09 2.1243: Use heat from boiler blowdown to preheat boiler feed water $9,377 $49,300 - - $9,377
-
MMBtu
- -
10 2.2113: Repair or replace steam traps $7,120 $5,500 - - $11,120
-
MMBtu
$(-4,000.0) -
11 2.7142: Utilize higher efficiency lamps and/or ballasts $6,792 $19,960 $5,768
211,438
kWh
$1,024
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $493,360 $529,899 $98,941
3,626,892
kWh
$37,180
-
kW-mo/yr
$320,780
-
MMBtu
$(-4,525.0) $40,984
TOTAL IMPLEMENTED $47,366 $26,460 $17,889
655,768
kWh
$6,631
-
kW-mo/yr
$27,371
-
MMBtu
$(-4,525.0) -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs