ITAC Assessment: WV0368
ITAC logo
ITAC Assessment: WV0368
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product Marbles
NAICS 339930: Doll, Toy, and Game Manufacturing
SIC 3944: Games, Toys, and Children's Vehicles, Except Dolls and Bicycles
Sales Range $1
M
to 5
M
# of Employees 25
Plant Area 45,000
ft2
Annual Production 850,000
lb
Production Hrs. Annual 2,080
hrs
Location (State) West Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $6,951 188,576
kWh
Electricity Demand $5,775 787
kW-mo/yr
Electricity Fees $1,153 -
Natural Gas $103,108 10,781
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $15,338 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,217

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.2511: Insulate bare equipment $11,312 $2,971 $356
9,669
kWh
- $10,956
-
MMBtu
02 3.1161: Eliminate/reduce an operation $1,977 $1,750 $1,192
32,314
kWh
$785
-
kW-mo/yr
-
03 2.7144: Install spectral reflectors / delamp $825 $140 $472
12,779
kWh
$353
-
kW-mo/yr
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $747 $1,927 $526
14,251
kWh
$221
-
kW-mo/yr
-
05 2.2437: Recover waste heat from equipment $296 $600 - - $296
-
MMBtu
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $181 $60 $84
2,281
kWh
$97
-
kW-mo/yr
-
TOTAL RECOMMENDED $15,338 $7,448 $2,630
71,294
kWh
$1,456
-
kW-mo/yr
$11,252
-
MMBtu
TOTAL IMPLEMENTED $14,217 $6,708 $2,158
58,515
kWh
$1,103
-
kW-mo/yr
$10,956
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs