Assessment Year | 2005 |
---|---|
Principal Product | Hose and Tubing |
NAICS | 331210: Iron and Steel Pipe and Tube Manufacturing from Purchased Steel |
SIC | 3496: Miscellaneous Fabricated Wire Products |
Sales Range | $10 M to 50M |
# of Employees | 200 |
Plant Area |
160,000
ft2
|
Annual Production | 48,000
thousand feet
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $98,110 | 5,452,982 |
kWh
|
$0.018 |
Electricity Demand | $174,387 | 12,155 |
kW-mo/yr
|
$14.35 |
Electricity Fees | $47,664 | - |
|
- |
Natural Gas | $120,571 | 15,614 |
MMBtu
|
$7.72 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $54,410 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $28,067 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.2614: Use cooling tower or economizer to replace chiller cooling | $15,465 | $18,600 |
$7,493
280,401
kWh
|
$7,972
-
kW-mo/yr
|
- | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $14,865 | $22,825 |
$7,204
269,577
kWh
|
$7,661
-
kW-mo/yr
|
- | - | |
03 | 2.7314: Reduce ventilation air | $9,874 | $3,940 | - | - |
$9,874
-
MMBtu
|
- | |
04 | 2.2511: Insulate bare equipment | $3,957 | $2,264 |
$1,916
71,785
kWh
|
$2,041
-
kW-mo/yr
|
- | - | |
05 | 2.4239: Eliminate or reduce compressed air usage | $2,906 | $1,560 |
$1,409
52,647
kWh
|
$1,497
-
kW-mo/yr
|
- | - | |
06 | 2.4239: Eliminate or reduce compressed air usage | $2,523 | $320 |
$1,221
45,776
kWh
|
$1,302
-
kW-mo/yr
|
- | - | |
07 | 2.1233: Analyze flue gas for proper air/fuel ratio | $2,352 | $1,000 | - | - |
$2,532
-
MMBtu
|
$(-180.0) | |
08 | 2.4231: Reduce the pressure of compressed air to the minimum required | $778 | $1,460 |
$377
14,102
kWh
|
$401
-
kW-mo/yr
|
- | - | |
09 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $686 | $440 |
$392
14,710
kWh
|
$414
-
kW-mo/yr
|
- | $(-120.0) | |
10 | 2.2628: Utilize a less expensive cooling method | $566 | $1,370 |
$274
10,255
kWh
|
$292
-
kW-mo/yr
|
- | - | |
11 | 2.2625: Chill water to the highest temperature possible | $438 | $30 |
$212
7,957
kWh
|
$226
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $54,410 | $53,809 |
$20,498
767,210
kWh
|
$21,806
-
kW-mo/yr
|
$12,406
-
MMBtu
|
$(-300.0) | ||
TOTAL IMPLEMENTED | $28,067 | $29,869 |
$12,519
468,597
kWh
|
$13,316
-
kW-mo/yr
|
$2,532
-
MMBtu
|
$(-300.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs