ITAC Assessment: WV0280
ITAC logo
ITAC Assessment: WV0280
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Aluminum Sheet
NAICS 331318: Other Aluminum Rolling, Drawing, and Extruding
SIC 3355: Aluminum Rolling and Drawing, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 182
Plant Area 300,000
ft2
Annual Production 120,000,000
lb
Production Hrs. Annual 8,568
hrs
Location (State) West Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $658,229 29,950,441
kWh
Electricity Demand $622,851 81,283
kW-mo/yr
Natural Gas $788,765 117,168
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $371,907 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $131,248

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
01 2.1133: Adjust burners for efficient operation $143,927 $209,000 - - $143,927
-
MMBtu
-
02 2.1113: Reduce combustion air flow to optimum $78,750 $1,000 - - $78,750
-
MMBtu
-
03 2.1213: Direct warmest air to combustion intake $63,438 $8,180 - - $63,438
-
MMBtu
-
04 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $27,160 $750 $18,654
848,821
kWh
$9,106
-
kW-mo/yr
- $(-600.0)
05 2.4322: Use or replace with energy efficient substitutes $23,943 $45,000 $16,090
732,021
kWh
$7,853
-
kW-mo/yr
- -
06 2.7111: Reduce illumination to minimum necessary levels $7,252 $750 $4,811
218,714
kWh
$2,441
-
kW-mo/yr
- -
07 2.4231: Reduce the pressure of compressed air to the minimum required $5,348 $100 $3,594
163,494
kWh
$1,754
-
kW-mo/yr
- -
08 3.6124: Burn waste oil for heat $4,718 $3,500 - - $4,718
-
MMBtu
-
09 2.4314: Use synthetic lubricant $4,705 $250 $3,162
143,863
kWh
$1,543
-
kW-mo/yr
- -
10 2.3131: Reschedule plant operations or reduce load to avoid peaks $4,633 - - $4,633
-
kW-mo/yr
- -
11 2.4111: Utilize energy-efficient belts and other improved mechanisms $4,080 $477 $2,742
124,751
kWh
$1,338
-
kW-mo/yr
- -
12 2.7142: Utilize higher efficiency lamps and/or ballasts $3,953 $7,230 $1,777
80,709
kWh
$2,176
-
kW-mo/yr
- -
TOTAL RECOMMENDED $371,907 $276,237 $50,830
2,312,373
kWh
$30,844
-
kW-mo/yr
$290,833
-
MMBtu
$(-600.0)
TOTAL IMPLEMENTED $131,248 $10,557 $34,740
1,580,352
kWh
$18,358
-
kW-mo/yr
$78,750
-
MMBtu
$(-600.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs