ITAC Assessment: WV0264
ITAC logo
ITAC Assessment: WV0264
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Green Lumber
NAICS 321912: Cut Stock, Resawing Lumber, and Planing
SIC 2421: Sawmills and Planing Mills, General
Sales Range $5
M
to 10
M
# of Employees 40
Plant Area 75,000
ft2
Annual Production 10,500
thousand feet
Production Hrs. Annual 2,142
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $59,599 1,869,846
kWh
Electricity Demand $47,284 7,752
kW-mo/yr
Electricity Fees $8,861 -
Natural Gas $2,243 333
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $15,142 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,421

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $5,905 $2,325 $2,902
88,486
kWh
$3,003
-
kW-mo/yr
-
02 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $5,722 $900 $3,341
101,964
kWh
$3,461
-
kW-mo/yr
$(-1,080.0)
03 2.4231: Reduce the pressure of compressed air to the minimum required $1,317 $90 $663
20,249
kWh
$654
-
kW-mo/yr
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $260 - $36
9,897
kWh
$224
-
kW-mo/yr
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $690 $3,419 $347
10,581
kWh
$343
-
kW-mo/yr
-
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $527 $250 $259
7,986
kWh
$268
-
kW-mo/yr
-
07 2.4239: Eliminate or reduce compressed air usage $721 $40 $355
10,796
kWh
$366
-
kW-mo/yr
-
TOTAL RECOMMENDED $15,142 $7,024 $7,903
249,959
kWh
$8,319
-
kW-mo/yr
$(-1,080.0)
TOTAL IMPLEMENTED $14,421 $6,984 $7,548
239,163
kWh
$7,953
-
kW-mo/yr
$(-1,080.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs