Assessment Year | 2003 |
---|---|
Principal Product | Green Lumber |
NAICS | 321912: Cut Stock, Resawing Lumber, and Planing |
SIC | 2421: Sawmills and Planing Mills, General |
Sales Range | $5 M to 10M |
# of Employees | 40 |
Plant Area |
75,000
ft2
|
Annual Production | 10,500
thousand feet
|
Production Hrs. Annual | 2,142
hrs
|
Location (State) | Kentucky |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $59,599 | 1,869,846 |
kWh
|
$0.032 |
Electricity Demand | $47,284 | 7,752 |
kW-mo/yr
|
$6.10 |
Electricity Fees | $8,861 | - |
|
- |
Natural Gas | $2,243 | 333 |
MMBtu
|
$6.74 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $15,142 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $14,421 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $5,905 | $2,325 |
$2,902
88,486
kWh
|
$3,003
-
kW-mo/yr
|
- | |
02 | 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary | $5,722 | $900 |
$3,341
101,964
kWh
|
$3,461
-
kW-mo/yr
|
$(-1,080.0) | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,317 | $90 |
$663
20,249
kWh
|
$654
-
kW-mo/yr
|
- | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $260 | - |
$36
9,897
kWh
|
$224
-
kW-mo/yr
|
- | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $690 | $3,419 |
$347
10,581
kWh
|
$343
-
kW-mo/yr
|
- | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $527 | $250 |
$259
7,986
kWh
|
$268
-
kW-mo/yr
|
- | |
07 | 2.4239: Eliminate or reduce compressed air usage | $721 | $40 |
$355
10,796
kWh
|
$366
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $15,142 | $7,024 |
$7,903
249,959
kWh
|
$8,319
-
kW-mo/yr
|
$(-1,080.0) | ||
TOTAL IMPLEMENTED | $14,421 | $6,984 |
$7,548
239,163
kWh
|
$7,953
-
kW-mo/yr
|
$(-1,080.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs